Natural gasOperatingPJM

Linden Generating Station

Natural gas power plant in Union County, New Jersey. 1,740 MW of nameplate capacity across 10 generators, operated by Linden Combined Cycle.

Also known as EIA plant 2406

Analyst: free account, 1 question a day.

Linden Solar FarmLinden Cogen PlantAmazon JFK8 Solar ProjectBayway RefineryDG InfineumIOS - ERW9Linden2 km
Open in the map
6 plants within 3.3 km, from EIA coordinates.

Key facts

Capacity
1,740 MWNameplate
Generators
10 operatingEIA-860M, August 2026
Operating since
June 1995First generator online
Operator
Linden Combined CycleEIA operator ID 65389
Grid
PJMBalancing authority PJM
Price nodes
10 PJM nodesResource nodes with prices
Location
Union County, NJ40.6217, −74.2072
EIA plant ID
2406EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Linden produces

Free · EIA-923

Net generation, 2025

4.44 TWh

4,442,175 MWh, final

Capacity factor, 2025

29.1%

2024: 31.2%

January to July 2026

2.67 TWh

Provisional

Range, 2016 to 2025

3.3–6.4

TWh a year. Low 2020, high 2016

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000302,587Not reported12 of 12
2001327,796Not reported12 of 12
2002435,762Not reported12 of 12
2003234,144Not reported12 of 12
2004262,195Not reported12 of 12
2005156,548Not reported12 of 12
2006115,975Not reported4 of 12
20071,937,094Not reported12 of 12
2008537,513Not reported2 of 12
20094,119,400Not reported12 of 12
20105,015,30836.0%12 of 12
20115,369,27138.6%12 of 12
20125,456,674Not reported12 of 12
20136,105,232Not reported12 of 12
20145,540,30639.7%11 of 12
20152,365,50346.4%4 of 12
20166,414,47642.0%12 of 12
20174,909,40032.2%12 of 12
2018Not reportedNot reported0 of 12
2019964,28939.1%2 of 12
20203,255,78521.3%12 of 12
20213,539,31923.2%12 of 12
20225,076,24533.3%12 of 12
20234,689,36630.8%12 of 12
20244,773,96931.2%12 of 12
20254,442,17529.1%12 of 12
2026 (provisional, partial year)2,667,63230.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

2.00M

US short tons. 2024: 2.11M

SO₂, 2025

10

US short tons

NOx, 2025

125

US short tons

CO₂ per MWh, calculated

0.45 t

About 901 lb per MWh

8 of 8 EPA units reported CO₂ in 2025 (1101, 1201, 2101, 2201, 5, 6, 7, 8), matched to EIA plant 2406 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

1,465

million gallons

Consumption, 2024

1,050

million gallons

Source

Linden Roselle Sewage Authority

Discharge, Reclaimed. Induced-draft tower

Watershed stress

Very low/none · 0.171

USGS SUI, HUC12 Morses Creek-Arthur Kill

12 of 12 cooling months report withdrawal. Reclaimed water or plant effluent; not tested. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
5Natural Gas Fired Combustion Turbine96.1June 2000
6Natural Gas Fired Combustion Turbine96.1June 2000
7Natural Gas Fired Combustion Turbine96.1June 1995
8Natural Gas Fired Combustion Turbine96.1June 1995
1001Natural Gas Fired Combined Cycle315.0April 2006
1101Natural Gas Fired Combined Cycle181.4April 2006
1201Natural Gas Fired Combined Cycle181.4April 2006
2001Natural Gas Fired Combined Cycle315.0April 2006
2101Natural Gas Fired Combined Cycle181.4April 2006
2201Natural Gas Fired Combined Cycle181.4April 2006

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Linden Combined Cycle as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Linden Generating Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Linden

Questions about Linden

How much power does Linden Generating Station produce?

Linden Generating Station reported 4,442,175 MWh (4.44 TWh) of net generation in 2025, a 29.1% capacity factor on 1,740 MW of nameplate capacity. From January to July 2026 it reported 2.67 TWh, which is provisional.

Where is Linden Generating Station?

Linden Generating Station is in Union County, New Jersey, at 40.6217, −74.2072. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Linden Generating Station?

EIA-860M for August 2026 lists Linden Combined Cycle as the operator (EIA operator ID 65389). The operator is not always the owner.

When did Linden Generating Station start operating?

Its first generator began operating in June 1995, according to EIA-860M.

Does InfraMap have power prices for Linden Generating Station?

Yes. InfraMap has PJM day-ahead and real-time prices at 10 price nodes linked to Linden Generating Station, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values