Reeves
Natural gas power plant in Bernalillo County, New Mexico. 154 MW of nameplate capacity across 3 generators, operated by Public Service Co of NM.
Also known as Reeves Generating Station · EIA plant 2450
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 154 MWNameplate
- Generators
- 3 operatingEIA-860M, August 2026
- Operating since
- March 1960First generator online
- Operator
- Public Service Co of NMEIA operator ID 15473
- Grid
- PNMBalancing authority PNM
- Price nodes
- None linkedNo verified ISO node
- Location
- Bernalillo County, NM35.1710, −106.6019
- EIA plant ID
- 2450EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Reeves produces
Free · EIA-923Net generation, 2025
167 GWh
167,095 MWh, final
Capacity factor, 2025
12.4%
2024: 13.6%
January to July 2026
118 GWh
Provisional
Range, 2015 to 2025
86.8–420.6
GWh a year. Low 2017, high 2023
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | 222,557 | Not reported | 12 of 12 |
| 2001 | 506,995 | Not reported | 12 of 12 |
| 2002 | 123,321 | Not reported | 12 of 12 |
| 2003 | 157,201 | Not reported | 12 of 12 |
| 2004 | 106,142 | Not reported | 12 of 12 |
| 2005 | 100,992 | Not reported | 12 of 12 |
| 2006 | 54,176 | Not reported | 12 of 12 |
| 2007 | 66,647 | Not reported | 12 of 12 |
| 2008 | 58,965 | Not reported | 12 of 12 |
| 2009 | 56,515 | Not reported | 12 of 12 |
| 2010 | 77,082 | 5.7% | 12 of 12 |
| 2011 | 10,331 | 9.3% | 1 of 12 |
| 2012 | 0 | 0.0% | 1 of 12 |
| 2013 | 94,058 | 7.0% | 12 of 12 |
| 2014 | 72,579 | 5.4% | 12 of 12 |
| 2015 | 131,856 | 9.8% | 12 of 12 |
| 2016 | 145,621 | 10.8% | 12 of 12 |
| 2017 | 86,810 | 6.4% | 12 of 12 |
| 2018 | 193,261 | 14.3% | 12 of 12 |
| 2019 | 187,436 | 13.9% | 12 of 12 |
| 2020 | 111,182 | 8.2% | 12 of 12 |
| 2021 | 105,426 | 7.8% | 12 of 12 |
| 2022 | 199,065 | 14.8% | 12 of 12 |
| 2023 | 420,601 | 31.2% | 12 of 12 |
| 2024 | 183,425 | 13.6% | 12 of 12 |
| 2025 | 167,095 | 12.4% | 12 of 12 |
| 2026 (provisional, partial year) | 117,836 | 15.0% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDCO₂, 2025
141,582
US short tons. 2024: 145,637
SO₂, 2025
1
US short tons
NOx, 2025
288
US short tons
CO₂ per MWh, calculated
0.85 t
About 1,695 lb per MWh
3 of 3 EPA units reported CO₂ in 2025 (1, 2, 3), matched to EIA plant 2450 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.
Water use
Free · EIA-923 cooling, USGSWithdrawal, 2024
189
million gallons
Consumption, 2024
132
million gallons
Source
Wells
Ground, Fresh. Induced-draft tower
Watershed stress
High · 0.629
USGS SUI, HUC12 Arroyo del Pino
36 of 36 cooling months report withdrawal. Groundwater user; SUI describes surface water and is context only. Blank volumes are unreported, not zero.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Natural Gas Steam Turbine | 44.0 | August 1960 |
| 2 | Natural Gas Steam Turbine | 44.0 | March 1960 |
| 3 | Natural Gas Steam Turbine | 66.0 | July 1962 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Public Service Co of NM as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Reeves and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Reeves
More plants operated by Public Service Co of NM
Questions about Reeves
How much power does Reeves produce?
Reeves reported 167,095 MWh (167 GWh) of net generation in 2025, a 12.4% capacity factor on 154 MW of nameplate capacity. From January to July 2026 it reported 118 GWh, which is provisional.
Where is Reeves?
Reeves is in Bernalillo County, New Mexico, at 35.1710, −106.6019. It is in the Public Service Company of New Mexico balancing area (PNM).
Who operates Reeves?
EIA-860M for August 2026 lists Public Service Co of NM as the operator (EIA operator ID 15473). The operator is not always the owner.
When did Reeves start operating?
Its first generator began operating in March 1960, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
- EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page