Natural gasOperatingPNM

Luna Energy Facility

Natural gas power plant in Luna County, New Mexico. 650 MW of nameplate capacity across 3 generators, operated by Public Service Co of NM.

Also known as EIA plant 55343

Analyst: free account, 1 question a day.

Solar PV Development…Deming Solar Energy CenterRockhound Sol Solar CSGMacho Springs Power IAlta LunaLuna Energy Facility25 km
Open in the map
6 plants within 41 km, from EIA coordinates.

Key facts

Capacity
650 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
April 2006First generator online
Operator
Public Service Co of NMEIA operator ID 15473
Grid
PNMBalancing authority PNM
Price nodes
None linkedNo verified ISO node
Location
Luna County, NM32.2993, −107.7834
EIA plant ID
55343EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Luna Energy Facility produces

Free · EIA-923

Net generation, 2025

1.66 TWh

1,662,177 MWh, final. 11 of 12 months reported

Capacity factor, 2025

31.6%

2024: 58.4%

January to July 2026

1.28 TWh

Provisional

Range, 2015 to 2024

1.7–3.6

TWh a year. Low 2015, high 2023

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
20061,861,904Not reported9 of 12
20072,630,709Not reported12 of 12
20082,218,384Not reported12 of 12
20091,646,169Not reported12 of 12
20101,907,38333.5%12 of 12
20111,794,47331.5%12 of 12
20121,810,83831.7%12 of 12
20131,999,343Not reported12 of 12
20142,052,62936.0%12 of 12
20151,717,30830.2%12 of 12
20162,319,17240.6%12 of 12
20172,479,67043.5%12 of 12
20182,719,23747.8%12 of 12
20192,638,04246.3%12 of 12
20203,303,68457.9%12 of 12
20213,053,29553.6%12 of 12
20223,333,46958.5%12 of 12
20233,576,28562.8%12 of 12
20243,332,31858.4%12 of 12
20251,662,17731.6%11 of 12
2026 (provisional, partial year)1,280,59638.7%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

757,354

US short tons. 2024: 1.43M

SO₂, 2025

4

US short tons

NOx, 2025

72

US short tons

2 of 2 EPA units reported CO₂ in 2025 (CTG1, CTG2), matched to EIA plant 55343 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

788

million gallons

Consumption, 2024

788

million gallons

Source

Wells

Ground, Fresh. Induced-draft tower

Watershed stress

Low · 0.217

USGS SUI, HUC12 Town of Peruhill-Mimbres River

12 of 12 cooling months report withdrawal. Groundwater user; SUI describes surface water and is context only. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CTG1Natural Gas Fired Combined Cycle175.0April 2006
CTG2Natural Gas Fired Combined Cycle175.0April 2006
STG1Natural Gas Fired Combined Cycle300.0April 2006

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Public Service Co of NM as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Luna Energy Facility and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Luna Energy Facility

More plants operated by Public Service Co of NM

Questions about Luna Energy Facility

How much power does Luna Energy Facility produce?

Luna Energy Facility reported 1,662,177 MWh (1.66 TWh) of net generation in 2025, a 31.6% capacity factor on 650 MW of nameplate capacity. From January to July 2026 it reported 1.28 TWh, which is provisional. 11 of 12 months were reported for 2025.

Where is Luna Energy Facility?

Luna Energy Facility is in Luna County, New Mexico, at 32.2993, −107.7834. It is in the Public Service Company of New Mexico balancing area (PNM).

Who operates Luna Energy Facility?

EIA-860M for August 2026 lists Public Service Co of NM as the operator (EIA operator ID 15473). The operator is not always the owner.

When did Luna Energy Facility start operating?

Its first generator began operating in April 2006, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page