Bowline Point
Natural gas power plant in Rockland County, New York. 1,242 MW of nameplate capacity across 2 generators, operated by Bowline, LLC.
Also known as Bowline Point Power Plant · EIA plant 2625
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 1,242 MWNameplate
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- September 1972First generator online
- Operator
- Bowline, LLCEIA operator ID 64082
- Grid
- NYISOBalancing authority NYIS
- Price nodes
- 2 NYISO nodesResource nodes with prices
- Location
- Rockland County, NY41.2044, −73.9689
- EIA plant ID
- 2625EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Bowline Point produces
Free · EIA-923Net generation, 2025
1.96 TWh
1,959,440 MWh, final
Capacity factor, 2025
18.0%
2024: 11.8%
January to July 2026
857 GWh
Provisional
Range, 2015 to 2025
0.3–2.0
TWh a year. Low 2019, high 2025
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | 1,270,910 | Not reported | 12 of 12 |
| 2001 | 1,715,931 | Not reported | 12 of 12 |
| 2002 | 1,696,113 | Not reported | 12 of 12 |
| 2003 | 1,171,574 | Not reported | 12 of 12 |
| 2004 | 1,041,053 | Not reported | 12 of 12 |
| 2005 | 1,169,688 | Not reported | 12 of 12 |
| 2006 | 226,622 | Not reported | 12 of 12 |
| 2007 | 588,160 | Not reported | 12 of 12 |
| 2008 | 5,236 | Not reported | 1 of 12 |
| 2009 | 128,456 | Not reported | 12 of 12 |
| 2010 | 293,023 | 2.7% | 12 of 12 |
| 2011 | 199,652 | 1.8% | 12 of 12 |
| 2012 | 381,649 | 3.5% | 12 of 12 |
| 2013 | 1,221,412 | 11.2% | 12 of 12 |
| 2014 | 1,479,641 | 13.6% | 12 of 12 |
| 2015 | 1,447,630 | 13.3% | 12 of 12 |
| 2016 | 1,386,146 | 12.7% | 12 of 12 |
| 2017 | 1,210,567 | 11.1% | 12 of 12 |
| 2018 | 473,118 | 4.3% | 12 of 12 |
| 2019 | 286,744 | 2.6% | 12 of 12 |
| 2020 | 660,492 | 6.1% | 12 of 12 |
| 2021 | 979,156 | 9.0% | 12 of 12 |
| 2022 | 1,465,589 | 13.5% | 12 of 12 |
| 2023 | 935,829 | 8.6% | 12 of 12 |
| 2024 | 1,285,944 | 11.8% | 12 of 12 |
| 2025 | 1,959,440 | 18.0% | 12 of 12 |
| 2026 (provisional, partial year) | 857,040 | 13.6% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · NYISOEmissions
Free · EPA CAMPDCO₂, 2025
1.20M
US short tons. 2024: 809,976
SO₂, 2025
116
US short tons
NOx, 2025
1,216
US short tons
CO₂ per MWh, calculated
0.61 t
About 1,221 lb per MWh
2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 2625 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.
Water use
Free · EIA-923 cooling, USGSWithdrawal, 2024
79,466
million gallons
Consumption, 2024
0
million gallons
Source
HUDSON RIVER
Surface, Brackish. Once-through
Watershed stress
Very low/none · 0.138
USGS SUI, HUC12 Furnace Brook-Hudson River
24 of 24 cooling months report withdrawal. Saline, brackish or ocean intake; not tested. Blank volumes are unreported, not zero.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Natural Gas Steam Turbine | 621.0 | September 1972 |
| 2 | Natural Gas Steam Turbine | 621.0 | May 1974 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Bowline, LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Bowline Point and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Bowline Point
Questions about Bowline Point
How much power does Bowline Point produce?
Bowline Point reported 1,959,440 MWh (1.96 TWh) of net generation in 2025, a 18.0% capacity factor on 1,242 MW of nameplate capacity. From January to July 2026 it reported 857 GWh, which is provisional.
Where is Bowline Point?
Bowline Point is in Rockland County, New York, at 41.2044, −73.9689. It is in the New York Independent System Operator balancing area (NYIS).
Who operates Bowline Point?
EIA-860M for August 2026 lists Bowline, LLC as the operator (EIA operator ID 64082). The operator is not always the owner.
When did Bowline Point start operating?
Its first generator began operating in September 1972, according to EIA-860M.
Does InfraMap have power prices for Bowline Point?
Yes. InfraMap has NYISO day-ahead and real-time prices at 2 price nodes linked to Bowline Point, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
- NYISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page