Miami Fort
Coal power plant in Hamilton County, Ohio. 1,180.8 MW of nameplate capacity across 6 generators, operated by Luminant Miami Fort.
Also known as Miami Fort Station · EIA plant 2832
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 1,180.8 MWCoal 1,114.8 · Oil 66.0
- Generators
- 6 operatingEIA-860M, August 2026
- Operating since
- July 1971First generator online
- Operator
- Luminant Miami FortEIA operator ID 59919
- Grid
- PJMBalancing authority PJM
- Price nodes
- 2 PJM nodesResource nodes with prices
- Location
- Hamilton County, OH39.1128, −84.8036
- EIA plant ID
- 2832EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Miami Fort produces
Free · EIA-923Net generation, 2025
6.72 TWh
6,716,243 MWh, final
Capacity factor, 2025
64.9%
2024: 53.2%
January to July 2026
3.66 TWh
Provisional
Range, 2016 to 2025
2.8–7.0
TWh a year. Low 2023, high 2019
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | 8,354,403 | Not reported | 12 of 12 |
| 2001 | 6,799,924 | Not reported | 12 of 12 |
| 2002 | 7,587,241 | Not reported | 12 of 12 |
| 2003 | 7,618,201 | Not reported | 12 of 12 |
| 2004 | 7,614,546 | Not reported | 12 of 12 |
| 2005 | 7,566,870 | Not reported | 12 of 12 |
| 2006 | 7,678,893 | Not reported | 12 of 12 |
| 2007 | 6,920,514 | Not reported | 12 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | 8,634,556 | Not reported | 12 of 12 |
| 2010 | 8,562,709 | 72.7% | 12 of 12 |
| 2011 | 7,441,942 | 63.2% | 12 of 12 |
| 2012 | 8,307,828 | 70.4% | 12 of 12 |
| 2013 | 8,846,569 | 75.1% | 12 of 12 |
| 2014 | 7,676,749 | 65.2% | 12 of 12 |
| 2015 | 5,925,224 | Not reported | 11 of 12 |
| 2016 | 6,764,674 | 65.2% | 12 of 12 |
| 2017 | 6,744,234 | 65.2% | 12 of 12 |
| 2018 | 5,409,444 | 52.3% | 12 of 12 |
| 2019 | 6,974,467 | 67.4% | 12 of 12 |
| 2020 | 6,687,340 | 64.5% | 12 of 12 |
| 2021 | 6,776,495 | 65.5% | 12 of 12 |
| 2022 | 6,241,192 | 60.3% | 12 of 12 |
| 2023 | 2,781,603 | 26.9% | 12 of 12 |
| 2024 | 5,520,851 | 53.2% | 12 of 12 |
| 2025 | 6,716,243 | 64.9% | 12 of 12 |
| 2026 (provisional, partial year) | 3,664,451 | 61.0% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · PJMEmissions
Free · EPA CAMPDCO₂, 2015
6.44M
US short tons. 2014: 7.54M
SO₂, 2015
14,326
US short tons
NOx, 2015
5,828
US short tons
3 of 3 EPA units reported CO₂ in 2015 (6, 7, 8), matched to EIA plant 2832 through the EPA–EIA crosswalk.
Water use
Free · EIA-923 cooling, USGSWithdrawal, 2024
11,581
million gallons
Consumption, 2024
2,804
million gallons
Source
Ohio River
Surface, Fresh. Natural-draft tower
Watershed stress
Very low/none · 0.124
USGS SUI, HUC12 Garrison Creek-Ohio River
12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 7 | Conventional Steam Coal | 557.1 | May 1975 |
| 8 | Conventional Steam Coal | 557.7 | February 1978 |
| GT3 | Petroleum Liquids | 16.5 | July 1971 |
| GT4 | Petroleum Liquids | 16.5 | August 1971 |
| GT5 | Petroleum Liquids | 16.5 | September 1971 |
| GT6 | Petroleum Liquids | 16.5 | October 1971 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Luminant Miami Fort as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Miami Fort and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Miami Fort
Questions about Miami Fort
How much power does Miami Fort produce?
Miami Fort reported 6,716,243 MWh (6.72 TWh) of net generation in 2025, a 64.9% capacity factor on 1,180.8 MW of nameplate capacity. From January to July 2026 it reported 3.66 TWh, which is provisional.
Where is Miami Fort?
Miami Fort is in Hamilton County, Ohio, at 39.1128, −84.8036. It is in the PJM Interconnection, LLC balancing area (PJM).
Who operates Miami Fort?
EIA-860M for August 2026 lists Luminant Miami Fort as the operator (EIA operator ID 59919). The operator is not always the owner.
When did Miami Fort start operating?
Its first generator began operating in July 1971, according to EIA-860M.
Does InfraMap have power prices for Miami Fort?
Yes. InfraMap has PJM day-ahead and real-time prices at 2 price nodes linked to Miami Fort, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
- PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page