Niles Power Plant

Oil power plant in Trumbull County, Ohio. 27 MW of nameplate capacity across 1 generator, operated by Niles Power, LLC.

Also known as Niles Generating Station · EIA plant 2861

Analyst: free account, 1 question a day.

Middletown- OhioKSU TrumbullMahoningHickory Run Energy StationNiles20 km
Open in the map
6 plants within 33 km, from EIA coordinates.

Key facts

Capacity
27 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
July 1972First generator online
Operator
Niles Power, LLCEIA operator ID 63030
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Trumbull County, OH41.1669, −80.7477
EIA plant ID
2861EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Niles produces

Free · EIA-923

Net generation, 2025

182 MWh

182 MWh, final

Capacity factor, 2025

0.1%

2024: -0.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

−487.0–182.0

MWh a year. Low 2024, high 2025

Annual net generation, MWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20001,184,937Not reported12 of 12
20011,296,019Not reported12 of 12
20021,126,837Not reported12 of 12
2003987,394Not reported10 of 12
2004985,606Not reported12 of 12
20051,015,008Not reported12 of 12
2006891,032Not reported12 of 12
20071,161,443Not reported12 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
201031,5424.9%3 of 12
2011180,7017.0%12 of 12
201245,159Not reported12 of 12
2013Not reportedNot reported0 of 12
2014−521-0.2%12 of 12
2015−375-0.2%12 of 12
2016−254-0.1%12 of 12
2017−310-0.1%12 of 12
2018−329-0.1%12 of 12
2019−154-0.1%12 of 12
2020−56-0.0%12 of 12
2021−214-0.1%12 of 12
2022−376-0.2%12 of 12
2023−376-0.2%12 of 12
2024−487-0.2%12 of 12
20251820.1%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

Not reported

US short tons. 2024: Not reported

SO₂, 2025

3

US short tons

NOx, 2025

7

US short tons

0 of 1 EPA units reported CO₂ in 2025 (1, 2, CTA), matched to EIA plant 2861 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GT1Petroleum Liquids27.0July 1972

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Niles Power, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Niles Power Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Niles

Questions about Niles

How much power does Niles Power Plant produce?

Niles Power Plant reported 182 MWh (182 MWh) of net generation in 2025, a 0.1% capacity factor on 27 MW of nameplate capacity.

Where is Niles Power Plant?

Niles Power Plant is in Trumbull County, Ohio, at 41.1669, −80.7477. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Niles Power Plant?

EIA-860M for August 2026 lists Niles Power, LLC as the operator (EIA operator ID 63030). The operator is not always the owner.

When did Niles Power Plant start operating?

Its first generator began operating in July 1972, according to EIA-860M.

Does InfraMap have power prices for Niles Power Plant?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Niles Power Plant, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page