OilOperatingPJM

Mountain

Oil power plant in Cumberland County, Pennsylvania. 54 MW of nameplate capacity across 2 generators, operated by Mountain Power, LLC.

Also known as EIA plant 3111

Analyst: free account, 1 question a day.

Dickinson SolarKnouse Solar Project 1Hampden CSG 1 LLCAdams Solar LLC PAMountain10 km
Open in the map
6 plants within 28 km, from EIA coordinates.

Key facts

Capacity
54 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
June 1972First generator online
Operator
Mountain Power, LLCEIA operator ID 63037
Grid
PJMBalancing authority PJM
Price nodes
2 PJM nodesResource nodes with prices
Location
Cumberland County, PA40.1228, −77.1716
EIA plant ID
3111EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Mountain produces

Free · EIA-923

Net generation, 2025

16.3 GWh

16,293 MWh, final

Capacity factor, 2025

3.4%

2024: 0.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

1.7–16.3

GWh a year. Low 2019, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200010,803Not reported12 of 12
20015,316Not reported12 of 12
200211,044Not reported12 of 12
20037,624Not reported12 of 12
20043,084Not reported12 of 12
20058,214Not reported12 of 12
200610,991Not reported12 of 12
200716,789Not reported12 of 12
20085,521Not reported12 of 12
20091,570Not reported12 of 12
20104,8901.0%12 of 12
20116,3421.3%12 of 12
20125,6691.2%12 of 12
20132,9440.6%12 of 12
20143,0450.6%12 of 12
20153,7240.8%12 of 12
20162,6750.6%12 of 12
20177,4261.6%12 of 12
20186,7021.4%12 of 12
20191,7270.4%12 of 12
20203,5030.7%12 of 12
20213,7100.8%12 of 12
20226,8251.4%12 of 12
20232,9820.6%12 of 12
20243,6440.8%12 of 12
202516,2933.4%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

22,313

US short tons. 2024: 5,165

SO₂, 2025

14

US short tons

NOx, 2025

91

US short tons

CO₂ per MWh, calculated

1.37 t

About 2,739 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (31, 32), matched to EIA plant 3111 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Petroleum Liquids27.0June 1972
2Petroleum Liquids27.0June 1972

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Mountain Power, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Mountain and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Mountain

Questions about Mountain

How much power does Mountain produce?

Mountain reported 16,293 MWh (16.3 GWh) of net generation in 2025, a 3.4% capacity factor on 54 MW of nameplate capacity.

Where is Mountain?

Mountain is in Cumberland County, Pennsylvania, at 40.1228, −77.1716. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Mountain?

EIA-860M for August 2026 lists Mountain Power, LLC as the operator (EIA operator ID 63037). The operator is not always the owner.

When did Mountain start operating?

Its first generator began operating in June 1972, according to EIA-860M.

Does InfraMap have power prices for Mountain?

Yes. InfraMap has PJM day-ahead and real-time prices at 2 price nodes linked to Mountain, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page