Key facts

Capacity
36 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
December 1967First generator online
Operator
Titus Power, LLCEIA operator ID 63041
Grid
PJMBalancing authority PJM
Price nodes
2 PJM nodesResource nodes with prices
Location
Berks County, PA40.3056, −75.9081
EIA plant ID
3115EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Titus produces

Free · EIA-923

Net generation, 2025

−291 MWh

−291 MWh, final

Capacity factor, 2025

-0.1%

2024: -0.3%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

−1.5–0.3

GWh a year. Low 2016, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20001,268,884Not reported12 of 12
2001828,684Not reported12 of 12
20021,087,161Not reported12 of 12
20031,011,043Not reported10 of 12
20041,116,838Not reported12 of 12
20051,273,979Not reported12 of 12
20061,156,743Not reported12 of 12
2007807,898Not reported7 of 12
2008Not reportedNot reported0 of 12
2009945,054Not reported12 of 12
2010740,48132.4%12 of 12
2011364,37415.9%12 of 12
201281,0343.5%12 of 12
2013Not reportedNot reported0 of 12
2014−967-0.3%12 of 12
2015−932-0.3%12 of 12
2016−1,466-0.5%12 of 12
2017−1,327-0.4%12 of 12
20181700.1%12 of 12
2019−1,245-0.4%12 of 12
2020−675-0.2%12 of 12
2021−335-0.1%12 of 12
20223210.1%12 of 12
2023−1,215-0.4%12 of 12
2024−822-0.3%12 of 12
2025−291-0.1%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2013

260,294

US short tons. 2012: 109,558

SO₂, 2013

2,394

US short tons

NOx, 2013

452

US short tons

3 of 3 EPA units reported CO₂ in 2013 (1, 2, 3), matched to EIA plant 3115 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
4Petroleum Liquids18.0December 1967
5Petroleum Liquids18.0August 1970

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Titus Power, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Titus and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Titus

Questions about Titus

How much power does Titus produce?

Titus reported −291 MWh (−291 MWh) of net generation in 2025.

Where is Titus?

Titus is in Berks County, Pennsylvania, at 40.3056, −75.9081. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Titus?

EIA-860M for August 2026 lists Titus Power, LLC as the operator (EIA operator ID 63041). The operator is not always the owner.

When did Titus start operating?

Its first generator began operating in December 1967, according to EIA-860M.

Does InfraMap have power prices for Titus?

Yes. InfraMap has PJM day-ahead and real-time prices at 2 price nodes linked to Titus, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page