Key facts

Capacity
892 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
April 1972First generator online
Operator
City of San Antonio - (TX)EIA operator ID 16604
Grid
ERCOTBalancing authority ERCO
Price nodes
2 ERCOT nodesResource nodes with prices
Location
Bexar County, TX29.3081, −98.3242
EIA plant ID
3611EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power O W Sommers produces

Free · EIA-923

Net generation, 2025

2.28 TWh

2,278,173 MWh, final

Capacity factor, 2025

29.2%

2024: 32.3%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.4–2.5

TWh a year. Low 2017, high 2024

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20002,564,440Not reported12 of 12
20011,206,473Not reported12 of 12
2002814,900Not reported12 of 12
2003739,875Not reported12 of 12
2004644,014Not reported12 of 12
2005966,683Not reported12 of 12
20061,305,476Not reported12 of 12
20071,402,671Not reported12 of 12
20081,390,282Not reported12 of 12
20091,360,929Not reported12 of 12
2010761,0049.7%12 of 12
2011437,4665.6%12 of 12
2012660,0658.4%12 of 12
2013800,44710.2%12 of 12
2014470,9446.0%12 of 12
2015517,2106.6%12 of 12
2016424,2895.4%12 of 12
2017421,7785.4%12 of 12
2018912,42711.7%12 of 12
20191,108,62714.2%12 of 12
2020914,43811.7%12 of 12
20211,166,28914.9%12 of 12
20221,401,27217.9%12 of 12
20231,904,80224.4%12 of 12
20242,531,72832.3%12 of 12
20252,278,17329.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

CO₂, 2025

1.40M

US short tons. 2024: 1.61M

SO₂, 2025

7

US short tons

NOx, 2025

2,257

US short tons

CO₂ per MWh, calculated

0.62 t

About 1,233 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 3611 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

180,452

million gallons

Consumption, 2024

3,735

million gallons

Source

Calaveras Lake

Surface, Fresh. Recirculating with cooling pond

Watershed stress

Severe · 0.875

USGS SUI, HUC12 Upper Calaveras Creek

24 of 24 cooling months report withdrawal. SUI of the HUC12 containing the plant. Cooling-pond plants report water circulated through the pond as withdrawal, so withdrawal is far above consumption. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Steam Turbine446.0April 1972
2Natural Gas Steam Turbine446.0January 1974

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists City of San Antonio - (TX) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query O W Sommers and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near O W Sommers

More plants operated by City of San Antonio - (TX)

Questions about O W Sommers

How much power does O W Sommers produce?

O W Sommers reported 2,278,173 MWh (2.28 TWh) of net generation in 2025, a 29.2% capacity factor on 892 MW of nameplate capacity.

Where is O W Sommers?

O W Sommers is in Bexar County, Texas, at 29.3081, −98.3242. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates O W Sommers?

EIA-860M for August 2026 lists City of San Antonio - (TX) as the operator (EIA operator ID 16604). The operator is not always the owner.

When did O W Sommers start operating?

Its first generator began operating in April 1972, according to EIA-860M.

Does InfraMap have power prices for O W Sommers?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 2 price nodes linked to O W Sommers, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page