Natural gasOperatingERCOT

R W Miller

Natural gas power plant in Palo Pinto County, Texas. 537.6 MW of nameplate capacity across 4 generators, operated by RW Miller Power LLC.

Also known as R W Miller power plant · R.W. Miller · RW Miller · EIA plant 3628

Analyst: free account, 1 question a day.

Mineral Wells East BESSBuckthorn WindLa Casa WindSilver Star I Wind Power ProjectHecate Energy Longhorn Solar LLCR W Miller25 km
Open in the map
6 plants within 44 km, from EIA coordinates.

Key facts

Capacity
537.6 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
July 1972First generator online
Operator
RW Miller Power LLCEIA operator ID 66086
Grid
ERCOTBalancing authority ERCO
Price nodes
2 ERCOT nodesResource nodes with prices
Location
Palo Pinto County, TX32.6581, −98.3103
EIA plant ID
3628EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power R W Miller produces

Free · EIA-923

Net generation, 2025

880 GWh

880,411 MWh, final. 10 of 12 months reported

Capacity factor, 2025

19.9%

2024: 9.3%

January to July 2026

135 GWh

Provisional. 6 of 7 months reported

Range, 2015 to 2022

141.9–402.1

GWh a year. Low 2017, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20001,784,594Not reported12 of 12
20011,242,148Not reported12 of 12
2002717,635Not reported12 of 12
2003520,420Not reported12 of 12
2004373,948Not reported12 of 12
2005949,473Not reported12 of 12
2006760,686Not reported12 of 12
2007309,952Not reported12 of 12
2008542,483Not reported12 of 12
2009553,004Not reported12 of 12
2010383,9557.3%12 of 12
2011400,2827.6%12 of 12
2012297,4485.6%12 of 12
2013164,7433.1%12 of 12
2014166,0203.1%12 of 12
2015185,2503.5%12 of 12
2016251,5114.7%12 of 12
2017141,9012.7%12 of 12
2018402,0627.6%12 of 12
2019395,0367.5%12 of 12
2020179,8263.4%12 of 12
2021256,6414.9%12 of 12
2022354,4376.7%12 of 12
2023457,9339.4%11 of 12
2024450,3709.3%11 of 12
2025880,41119.9%10 of 12
2026 (provisional, partial year)134,9365.1%6 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

CO₂, 2020

130,375

US short tons. 2019: 308,990

SO₂, 2020

1

US short tons

NOx, 2020

148

US short tons

CO₂ per MWh, calculated

0.73 t

About 1,450 lb per MWh

5 of 5 EPA units reported CO₂ in 2020 (**4, **5, 1, 2, 3), matched to EIA plant 3628 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

62,603

million gallons

Consumption, 2024

0

million gallons

Source

Lake Palo Pinto

Surface, Fresh. Once-through

Watershed stress

Low · 0.216

USGS SUI, HUC12 Palo Pinto Creek Reservoir-Palo Pinto Creek

36 of 36 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
2Natural Gas Steam Turbine100.0July 1972
3Natural Gas Steam Turbine200.0August 1975
4Natural Gas Fired Combustion Turbine118.8July 1994
5Natural Gas Fired Combustion Turbine118.8July 1994

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists RW Miller Power LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query R W Miller and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near R W Miller

Questions about R W Miller

How much power does R W Miller produce?

R W Miller reported 880,411 MWh (880 GWh) of net generation in 2025, a 19.9% capacity factor on 537.6 MW of nameplate capacity. From January to July 2026 it reported 135 GWh, which is provisional. 10 of 12 months were reported for 2025.

Where is R W Miller?

R W Miller is in Palo Pinto County, Texas, at 32.6581, −98.3103. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates R W Miller?

EIA-860M for August 2026 lists RW Miller Power LLC as the operator (EIA operator ID 66086). The operator is not always the owner.

When did R W Miller start operating?

Its first generator began operating in July 1972, according to EIA-860M.

Does InfraMap have power prices for R W Miller?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 2 price nodes linked to R W Miller, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page