WindOperatingERCOT

Silver Star I Wind Power Project

Wind power plant in Erath County, Texas. 52.8 MW of nameplate capacity across 1 generator, operated by Silver Star I Power Partners LLC.

Also known as Silver Star Wind Farm · Silver Star I · EIA plant 56771

Analyst: free account, 1 question a day.

Buckthorn WindTPE Erath Solar, LLCLa Casa WindR W MillerCISCO BESSSilver Star I Wind Po…25 km
Open in the map
6 plants within 60 km, from EIA coordinates.

Key facts

Capacity
52.8 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 2008First generator online
Operator
Silver Star I Power Partners LLCEIA operator ID 62076
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Erath County, TX32.3387, −98.4761
EIA plant ID
56771EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Silver Star I Wind Power Project produces

Free · EIA-923

Net generation, 2025

205 GWh

204,866 MWh, final

Capacity factor, 2025

44.3%

2024: 43.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

56.9–210.7

GWh a year. Low 2019, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
200855,599Not reported8 of 12
2009135,030Not reported12 of 12
2010180,95534.4%12 of 12
2011202,50838.5%12 of 12
2012186,15035.3%12 of 12
2013172,75732.9%12 of 12
2014182,60534.7%12 of 12
2015163,47031.1%12 of 12
2016173,90133.0%12 of 12
2017146,56527.9%12 of 12
2018127,86524.3%12 of 12
201956,93110.8%12 of 12
202064,821Not reported12 of 12
2021210,67545.5%12 of 12
2022191,61441.4%12 of 12
2023186,07740.2%12 of 12
2024200,54443.2%12 of 12
2025204,86644.3%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine52.8September 2008

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Silver Star I Power Partners LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Silver Star I Wind Power Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Silver Star I Wind Power Project

Questions about Silver Star I Wind Power Project

How much power does Silver Star I Wind Power Project produce?

Silver Star I Wind Power Project reported 204,866 MWh (205 GWh) of net generation in 2025, a 44.3% capacity factor on 52.8 MW of nameplate capacity.

Where is Silver Star I Wind Power Project?

Silver Star I Wind Power Project is in Erath County, Texas, at 32.3387, −98.4761. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Silver Star I Wind Power Project?

EIA-860M for August 2026 lists Silver Star I Power Partners LLC as the operator (EIA operator ID 62076). The operator is not always the owner.

When did Silver Star I Wind Power Project start operating?

Its first generator began operating in September 2008, according to EIA-860M.

Does InfraMap have power prices for Silver Star I Wind Power Project?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Silver Star I Wind Power Project, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page