Stevens Point

Hydro power plant in Portage County, Wisconsin. 4.8 MW of nameplate capacity across 6 generators, operated by Consolidated Water Power Co.

Also known as Stevens Point Power Plant · EIA plant 3973

Analyst: free account, 1 question a day.

WhitingDu BayStevens Point MillBiron MillBironWisconsin RapidsStevens Point10 km
Open in the map
6 plants within 23 km, from EIA coordinates.

Key facts

Capacity
4.8 MWNameplate
Generators
6 operatingEIA-860M, August 2026
Operating since
January 1918First generator online
Operator
Consolidated Water Power CoEIA operator ID 4247
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Portage County, WI44.5153, −89.5850
EIA plant ID
3973EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Stevens Point produces

Free · EIA-923

Net generation, 2025

25.9 GWh

25,867 MWh, final

Capacity factor, 2025

61.5%

2024: 67.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

24.1–34.4

GWh a year. Low 2023, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20000Not reported12 of 12
200125,196Not reported12 of 12
200228,903Not reported12 of 12
200322,976Not reported12 of 12
200420,789Not reported12 of 12
200521,102Not reported12 of 12
200621,830Not reported12 of 12
200720,344Not reported12 of 12
200818,406Not reported12 of 12
200917,815Not reported12 of 12
201024,56258.4%12 of 12
201127,46965.3%12 of 12
201219,19145.5%12 of 12
201323,34955.5%12 of 12
201429,56570.3%12 of 12
201528,04966.7%12 of 12
201634,43581.7%12 of 12
201732,30376.8%12 of 12
201829,64570.5%12 of 12
201932,20776.6%12 of 12
202031,75075.3%12 of 12
202129,92471.2%12 of 12
202224,98159.4%12 of 12
202324,05357.2%12 of 12
202428,51367.6%12 of 12
202525,86761.5%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric0.8January 1918
2Conventional Hydroelectric0.8January 1918
3Conventional Hydroelectric0.8January 1918
4Conventional Hydroelectric0.8January 1918
5Conventional Hydroelectric0.8January 1918
6Conventional Hydroelectric0.8January 1918

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Consolidated Water Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Stevens Point and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Stevens Point

More plants operated by Consolidated Water Power Co

Questions about Stevens Point

How much power does Stevens Point produce?

Stevens Point reported 25,867 MWh (25.9 GWh) of net generation in 2025, a 61.5% capacity factor on 4.8 MW of nameplate capacity.

Where is Stevens Point?

Stevens Point is in Portage County, Wisconsin, at 44.5153, −89.5850. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Stevens Point?

EIA-860M for August 2026 lists Consolidated Water Power Co as the operator (EIA operator ID 4247). The operator is not always the owner.

When did Stevens Point start operating?

Its first generator began operating in January 1918, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page