Whiting

Hydro power plant in Portage County, Wisconsin. 5.1 MW of nameplate capacity across 10 generators, operated by Consolidated Water Power Co.

Also known as Whiting Dam and Powerhouse · EIA plant 3975

Analyst: free account, 1 question a day.

Stevens Point MillBiron MillBironDu BayWisconsin RapidsWhiting10 km
Open in the map
6 plants within 22 km, from EIA coordinates.

Key facts

Capacity
5.1 MWNameplate
Generators
10 operatingEIA-860M, August 2026
Operating since
January 1891First generator online
Operator
Consolidated Water Power CoEIA operator ID 4247
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Portage County, WI44.4889, −89.5756
EIA plant ID
3975EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Whiting produces

Free · EIA-923

Net generation, 2025

16.1 GWh

16,079 MWh, final

Capacity factor, 2025

36.0%

2024: 55.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

16.1–31.8

GWh a year. Low 2025, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20000Not reported12 of 12
200118,735Not reported12 of 12
200218,634Not reported12 of 12
200317,486Not reported12 of 12
200420,496Not reported12 of 12
200519,184Not reported12 of 12
200619,771Not reported12 of 12
200718,927Not reported12 of 12
200822,884Not reported12 of 12
200921,131Not reported12 of 12
201018,08240.5%12 of 12
201119,02942.6%12 of 12
201220,51345.8%12 of 12
201322,25149.8%12 of 12
201427,19560.9%12 of 12
201527,41361.4%12 of 12
201631,81871.0%12 of 12
201730,98569.4%12 of 12
201830,47468.2%12 of 12
201930,24367.7%12 of 12
202028,50063.6%12 of 12
202124,84855.6%12 of 12
202224,81055.5%12 of 12
202321,15247.3%12 of 12
202424,99755.8%12 of 12
202516,07936.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric1.2July 1963
2Conventional Hydroelectric0.5January 1891
3Conventional Hydroelectric0.5January 1891
4Conventional Hydroelectric0.5January 1891
5Conventional Hydroelectric0.5January 1891
6Conventional Hydroelectric0.5January 1891
7Conventional Hydroelectric0.5January 1891
8Conventional Hydroelectric0.3January 1891
9Conventional Hydroelectric0.3January 1891
10Conventional Hydroelectric0.3January 1891

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Consolidated Water Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Whiting and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Whiting

More plants operated by Consolidated Water Power Co

Questions about Whiting

How much power does Whiting produce?

Whiting reported 16,079 MWh (16.1 GWh) of net generation in 2025, a 36.0% capacity factor on 5.1 MW of nameplate capacity.

Where is Whiting?

Whiting is in Portage County, Wisconsin, at 44.4889, −89.5756. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Whiting?

EIA-860M for August 2026 lists Consolidated Water Power Co as the operator (EIA operator ID 4247). The operator is not always the owner.

When did Whiting start operating?

Its first generator began operating in January 1891, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page