Wood biomassOperatingMISO

Bay Front

Wood biomass power plant in Ashland County, Wisconsin. 47.2 MW of nameplate capacity across 2 generators, operated by Northern States Power Co - Minnesota.

Also known as Bayfront Steam Plant · EIA plant 3982

Analyst: free account, 1 question a day.

White River (WI)Saxon FallsBay Front25 km
Open in the map
3 plants within 41 km, from EIA coordinates.

Key facts

Capacity
47.2 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
January 1952First generator online
Operator
Northern States Power Co - MinnesotaEIA operator ID 13781
Grid
MISOBalancing authority MISO
Price nodes
2 MISO nodesResource nodes with prices
Location
Ashland County, WI46.5872, −90.9017
EIA plant ID
3982EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Bay Front produces

Free · EIA-923

Net generation, 2025

177 GWh

176,941 MWh, final

Capacity factor, 2025

Not reported

2024: 38.7%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

154.3–186.4

GWh a year. Low 2016, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000264,282Not reported12 of 12
2001331,254Not reported12 of 12
2002260,223Not reported12 of 12
2003296,711Not reported12 of 12
2004307,348Not reported12 of 12
2005337,076Not reported12 of 12
2006300,687Not reported12 of 12
2007366,619Not reported12 of 12
2008330,009Not reported12 of 12
2009293,248Not reported12 of 12
2010253,35243.0%12 of 12
2011227,13038.6%12 of 12
2012192,41132.6%12 of 12
2013208,86135.5%12 of 12
2014167,024Not reported11 of 12
2015177,02630.1%12 of 12
2016154,28026.1%12 of 12
2017175,58429.8%12 of 12
2018166,91428.4%12 of 12
2019185,594Not reported12 of 12
2020175,02242.2%12 of 12
2021186,42345.1%12 of 12
2022173,47542.0%12 of 12
2023154,88937.5%12 of 12
2024160,34438.7%12 of 12
2025176,941Not reported12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2025

302,544

US short tons. 2024: 294,501

SO₂, 2025

59

US short tons

NOx, 2025

274

US short tons

CO₂ per MWh, calculated

1.71 t

About 3,420 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2, 5), matched to EIA plant 3982 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
5Wood/Wood Waste Biomass20.0January 1952
6Wood/Wood Waste Biomass27.2January 1957

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Northern States Power Co - Minnesota as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Bay Front and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Bay Front

More plants operated by Northern States Power Co - Minnesota

Questions about Bay Front

How much power does Bay Front produce?

Bay Front reported 176,941 MWh (177 GWh) of net generation in 2025.

Where is Bay Front?

Bay Front is in Ashland County, Wisconsin, at 46.5872, −90.9017. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Bay Front?

EIA-860M for August 2026 lists Northern States Power Co - Minnesota as the operator (EIA operator ID 13781). The operator is not always the owner.

When did Bay Front start operating?

Its first generator began operating in January 1952, according to EIA-860M.

Does InfraMap have power prices for Bay Front?

Yes. InfraMap has MISO day-ahead and real-time prices at 2 price nodes linked to Bay Front, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page