OilOperatingMISO

Washington Island

Oil power plant in Door County, Wisconsin. 5 MW of nameplate capacity across 7 generators, operated by Washington Island El Coop, Inc.

Also known as Washington Island Electric Cooperative Powerhouse · EIA plant 4148

Analyst: free account, 1 question a day.

Fairbanks Wind ParkEscanaba MillGladstoneGrand RapidsHeritage Garden Wind…Washington Island25 km
Open in the map
6 plants within 56 km, from EIA coordinates.

Key facts

Capacity
5 MWNameplate
Generators
7 operatingEIA-860M, August 2026
Operating since
December 1945First generator online
Operator
Washington Island El Coop, IncEIA operator ID 20153
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Door County, WI45.3709, −86.9308
EIA plant ID
4148EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Washington Island produces

Free · EIA-923

Net generation, 2025

5 MWh

5 MWh, final

Capacity factor, 2025

0.0%

2024: Not reported

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

5.0–235.0

MWh a year. Low 2025, high 2018

Annual net generation, MWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20000Not reported12 of 12
200192Not reported12 of 12
2002288Not reported12 of 12
2003162Not reported12 of 12
200450Not reported12 of 12
2005531Not reported12 of 12
2006207Not reported12 of 12
200798Not reported12 of 12
200863Not reported12 of 12
200939Not reported12 of 12
2010560.1%12 of 12
2011400.1%12 of 12
2012330.1%12 of 12
2013490.1%12 of 12
2014450.1%12 of 12
2015300.1%12 of 12
20161250.3%12 of 12
2017140.0%12 of 12
20182350.5%12 of 12
2019270.1%12 of 12
202090.0%12 of 12
2021150.0%12 of 12
2022110.0%12 of 12
202390.0%12 of 12
2024Not reportedNot reported0 of 12
202550.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
2Petroleum Liquids0.1August 1952
3Petroleum Liquids0.1December 1945
4Petroleum Liquids0.2April 1951
5Petroleum Liquids0.5June 1968
6Petroleum Liquids0.9July 1972
7Petroleum Liquids1.6January 1997
8Petroleum Liquids1.6January 1997

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Washington Island El Coop, Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Washington Island and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Washington Island

Questions about Washington Island

How much power does Washington Island produce?

Washington Island reported 5 MWh (5 MWh) of net generation in 2025, a 0.0% capacity factor on 5 MW of nameplate capacity.

Where is Washington Island?

Washington Island is in Door County, Wisconsin, at 45.3709, −86.9308. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Washington Island?

EIA-860M for August 2026 lists Washington Island El Coop, Inc as the operator (EIA operator ID 20153). The operator is not always the owner.

When did Washington Island start operating?

Its first generator began operating in December 1945, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page