Easton 2

Oil power plant in Talbot County, Maryland. 38.8 MW of nameplate capacity across 8 generators, operated by Easton Utilities Comm.

Also known as Easton 2 Power Plant · EIA plant 4257

Analyst: free account, 1 question a day.

MEBAWye Mills VNEM CSGChesapeake CollegeUMCES Ground MountCabin Creek MDEaston 210 km
Open in the map
6 plants within 25 km, from EIA coordinates.

Key facts

Capacity
38.8 MWNameplate
Generators
8 operatingEIA-860M, August 2026
Operating since
March 1978First generator online
Operator
Easton Utilities CommEIA operator ID 5625
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Talbot County, MD38.7950, −76.0700
EIA plant ID
4257EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Easton 2 produces

Free · EIA-923

Net generation, 2025

4.37 GWh

4,367 MWh, final

Capacity factor, 2025

1.3%

2024: -0.2%

January to July 2026

4.51 GWh

Provisional

Range, 2015 to 2025

−0.8–6.0

GWh a year. Low 2023, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20000Not reported12 of 12
200114,674Not reported6 of 12
200213,025Not reported12 of 12
200322,375Not reported12 of 12
200414,148Not reported12 of 12
200523,601Not reported12 of 12
20066,443Not reported12 of 12
200712,240Not reported12 of 12
20083,164Not reported12 of 12
2009589Not reported12 of 12
20101,753Not reported12 of 12
20114,7001.4%12 of 12
20123,6701.1%12 of 12
201312,9073.8%12 of 12
20146,8112.0%12 of 12
20155,9641.8%12 of 12
2016−697-0.2%12 of 12
20179240.3%12 of 12
20182,6980.8%12 of 12
2019−807-0.2%12 of 12
2020−508-0.1%12 of 12
202113Not reported12 of 12
20225,3081.6%12 of 12
2023−815-0.2%12 of 12
2024−674-0.2%12 of 12
20254,3671.3%12 of 12
2026 (provisional, partial year)4,5062.3%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
21Petroleum Liquids6.2March 1978
22Petroleum Liquids6.2March 1978
23Petroleum Liquids6.3June 1989
24Petroleum Liquids6.3June 1989
201Petroleum Liquids1.5May 1995
202Petroleum Liquids1.5May 1995
203Petroleum Liquids5.4November 2004
204Petroleum Liquids5.4November 2004

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Easton Utilities Comm as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Easton 2 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Easton 2

More plants operated by Easton Utilities Comm

Questions about Easton 2

How much power does Easton 2 produce?

Easton 2 reported 4,367 MWh (4.37 GWh) of net generation in 2025, a 1.3% capacity factor on 38.8 MW of nameplate capacity. From January to July 2026 it reported 4.51 GWh, which is provisional.

Where is Easton 2?

Easton 2 is in Talbot County, Maryland, at 38.7950, −76.0700. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Easton 2?

EIA-860M for August 2026 lists Easton Utilities Comm as the operator (EIA operator ID 5625). The operator is not always the owner.

When did Easton 2 start operating?

Its first generator began operating in March 1978, according to EIA-860M.

Does InfraMap have power prices for Easton 2?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Easton 2, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page