Natural gasOperatingPSCO

Cherokee

Natural gas power plant in Adams County, Colorado. 1,006.4 MW of nameplate capacity across 4 generators, operated by Public Service Co of Colorado.

Also known as Cherokee Generating Station · EIA plant 469

Analyst: free account, 1 question a day.

Amazon Denver DEN3Mtn. Solar 4 (CSG)Arapahoe Combustion T…Cherokee10 km
Open in the map
6 plants within 16 km, from EIA coordinates.

Key facts

Capacity
1,006.4 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
June 1968First generator online
Operator
Public Service Co of ColoradoEIA operator ID 15466
Grid
PSCOBalancing authority PSCO
Price nodes
None linkedNo verified ISO node
Location
Adams County, CO39.8073, −104.9645
EIA plant ID
469EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Cherokee produces

Free · EIA-923

Net generation, 2025

3.67 TWh

3,671,714 MWh, final

Capacity factor, 2025

41.6%

2024: 38.4%

January to July 2026

1.60 TWh

Provisional

Range, 2016 to 2025

3.0–4.6

TWh a year. Low 2021, high 2016

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20004,747,647Not reported12 of 12
20014,655,062Not reported12 of 12
20024,335,810Not reported12 of 12
20034,666,650Not reported12 of 12
20044,966,908Not reported12 of 12
20054,995,200Not reported12 of 12
20064,782,832Not reported12 of 12
20074,772,412Not reported12 of 12
20084,534,806Not reported12 of 12
20093,210,172Not reported12 of 12
20103,671,76552.3%12 of 12
20113,954,128Not reported12 of 12
20123,020,306Not reported12 of 12
20132,873,76959.5%12 of 12
20141,251,69062.6%5 of 12
20151,625,111Not reported5 of 12
20164,633,89352.4%12 of 12
20174,274,897Not reported12 of 12
20183,841,87843.6%12 of 12
20193,932,40444.6%12 of 12
20203,829,22443.3%12 of 12
20213,005,95234.1%12 of 12
20223,221,12036.5%12 of 12
20233,559,50640.4%12 of 12
20243,397,49338.4%12 of 12
20253,671,71441.6%12 of 12
2026 (provisional, partial year)1,599,34231.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

1.71M

US short tons. 2024: 1.56M

SO₂, 2025

9

US short tons

NOx, 2025

363

US short tons

CO₂ per MWh, calculated

0.47 t

About 933 lb per MWh

3 of 3 EPA units reported CO₂ in 2025 (1, 2, 3, 4, 5, 6), matched to EIA plant 469 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

843

million gallons

Consumption, 2024

843

million gallons

Source

South Platte River

Surface, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.149

USGS SUI, HUC12 Cherry Creek-South Platte River

12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
4Natural Gas Steam Turbine380.8June 1968
5Natural Gas Fired Combined Cycle185.3August 2015
6Natural Gas Fired Combined Cycle185.3August 2015
7Natural Gas Fired Combined Cycle255.0August 2015

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Public Service Co of Colorado as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Cherokee and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Cherokee

More plants operated by Public Service Co of Colorado

Questions about Cherokee

How much power does Cherokee produce?

Cherokee reported 3,671,714 MWh (3.67 TWh) of net generation in 2025, a 41.6% capacity factor on 1,006.4 MW of nameplate capacity. From January to July 2026 it reported 1.60 TWh, which is provisional.

Where is Cherokee?

Cherokee is in Adams County, Colorado, at 39.8073, −104.9645. It is in the Public Service Company of Colorado balancing area (PSCO).

Who operates Cherokee?

EIA-860M for August 2026 lists Public Service Co of Colorado as the operator (EIA operator ID 15466). The operator is not always the owner.

When did Cherokee start operating?

Its first generator began operating in June 1968, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page