Other fuelsOperatingERCOT

BP Chemicals Green Lake Plant

Other fuels power plant in Calhoun County, Texas. 38.8 MW of nameplate capacity across 2 generators, operated by INEOS Nitriles Greenlake.

Also known as EIA plant 50404

Analyst: free account, 1 question a day.

Seadrift Coke LPUnion Carbide Seadrift CogenTX2 Port LavacaVictoria Texas PlantTres Port Power, LLCVictoria Port IIBP Chemicals Green La…10 km
Open in the map
6 plants within 18 km, from EIA coordinates.

Key facts

Capacity
38.8 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
March 1989First generator online
Operator
INEOS Nitriles GreenlakeEIA operator ID 54837
Grid
ERCOTBalancing authority ERCO
Price nodes
None linkedNo verified ISO node
Location
Calhoun County, TX28.5707, −96.8333
EIA plant ID
50404EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power BP Chemicals Green Lake Plant produces

Free · EIA-923

Net generation, 2025

−52.1 GWh

−52,124 MWh, final

Capacity factor, 2025

-15.3%

2024: -9.0%

January to July 2026

−18.9 GWh

Provisional

Range, 2015 to 2025

−52.1–74.4

GWh a year. Low 2025, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200179,677Not reported12 of 12
2002296,132Not reported12 of 12
2003244,217Not reported12 of 12
2004227,069Not reported12 of 12
2005198,372Not reported12 of 12
2006226,068Not reported12 of 12
2007226,608Not reported12 of 12
20082,896Not reported12 of 12
20093,256Not reported12 of 12
201047,91414.1%12 of 12
201138,33411.3%12 of 12
201236,10210.6%12 of 12
20132,2590.7%12 of 12
201415,4044.5%12 of 12
201518,0185.3%12 of 12
201674,36321.8%12 of 12
201737,74611.1%12 of 12
201854,52816.0%12 of 12
201940,52011.9%12 of 12
202031,9639.4%12 of 12
202139,90011.7%12 of 12
202215,3514.5%12 of 12
2023−5,758-1.7%12 of 12
2024−30,587-9.0%12 of 12
2025−52,124-15.3%12 of 12
2026 (provisional, partial year)−18,858-9.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
TG2All Other15.0March 1989
TG3All Other23.8January 1997

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists INEOS Nitriles Greenlake as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query BP Chemicals Green Lake Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near BP Chemicals Green Lake Plant

Questions about BP Chemicals Green Lake Plant

How much power does BP Chemicals Green Lake Plant produce?

BP Chemicals Green Lake Plant reported −52,124 MWh (−52.1 GWh) of net generation in 2025. From January to July 2026 it reported −18.9 GWh, which is provisional.

Where is BP Chemicals Green Lake Plant?

BP Chemicals Green Lake Plant is in Calhoun County, Texas, at 28.5707, −96.8333. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates BP Chemicals Green Lake Plant?

EIA-860M for August 2026 lists INEOS Nitriles Greenlake as the operator (EIA operator ID 54837). The operator is not always the owner.

When did BP Chemicals Green Lake Plant start operating?

Its first generator began operating in March 1989, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page