Natural gasOperatingNYISO

Indeck Yerkes Energy Center

Natural gas power plant in Erie County, New York. 59.9 MW of nameplate capacity across 2 generators, operated by Indeck-Yerkes Ltd Partnership.

Also known as EIA plant 50451

Analyst: free account, 1 question a day.

Corning Riverview (CSG)NY Grand Island 871 Whitehaven Rd SolarComfort CSGWorld Generation XMillersport GM 1Indeck Yerkes5 km
Open in the map
6 plants within 11 km, from EIA coordinates.

Key facts

Capacity
59.9 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
December 1989First generator online
Operator
Indeck-Yerkes Ltd PartnershipEIA operator ID 9243
Grid
NYISOBalancing authority NYIS
Price nodes
1 NYISO nodeResource nodes with prices
Location
Erie County, NY42.9671, −78.9182
EIA plant ID
50451EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Indeck Yerkes produces

Free · EIA-923

Net generation, 2025

62.8 GWh

62,786 MWh, final

Capacity factor, 2025

12.0%

2024: 4.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

14.5–121.3

GWh a year. Low 2022, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200034,707Not reported12 of 12
200163,174Not reported12 of 12
200276,225Not reported12 of 12
200323,958Not reported12 of 12
200440,985Not reported12 of 12
200520,503Not reported12 of 12
200614,256Not reported12 of 12
200721,709Not reported12 of 12
20087,325Not reported12 of 12
20096,682Not reported12 of 12
201018,7613.6%12 of 12
201111,2682.1%12 of 12
201253,72510.2%12 of 12
201356,214Not reported12 of 12
201467,54912.9%12 of 12
2015121,26023.1%12 of 12
2016103,46419.7%12 of 12
201748,7509.3%12 of 12
201860,48311.5%12 of 12
201925,2644.8%12 of 12
202022,0054.2%12 of 12
202122,2564.2%12 of 12
202214,4972.8%12 of 12
202330,8365.9%12 of 12
202420,9444.0%12 of 12
202562,78612.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · NYISO

Emissions

Free · EPA CAMPD

CO₂, 2025

37,500

US short tons. 2024: 13,083

SO₂, 2025

0

US short tons

NOx, 2025

45

US short tons

CO₂ per MWh, calculated

0.60 t

About 1,195 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (1), matched to EIA plant 50451 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Natural Gas Fired Combined Cycle40.6December 1989
GEN2Natural Gas Fired Combined Cycle19.3December 1989

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Indeck-Yerkes Ltd Partnership as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Indeck Yerkes Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Indeck Yerkes

Questions about Indeck Yerkes

How much power does Indeck Yerkes Energy Center produce?

Indeck Yerkes Energy Center reported 62,786 MWh (62.8 GWh) of net generation in 2025, a 12.0% capacity factor on 59.9 MW of nameplate capacity.

Where is Indeck Yerkes Energy Center?

Indeck Yerkes Energy Center is in Erie County, New York, at 42.9671, −78.9182. It is in the New York Independent System Operator balancing area (NYIS).

Who operates Indeck Yerkes Energy Center?

EIA-860M for August 2026 lists Indeck-Yerkes Ltd Partnership as the operator (EIA operator ID 9243). The operator is not always the owner.

When did Indeck Yerkes Energy Center start operating?

Its first generator began operating in December 1989, according to EIA-860M.

Does InfraMap have power prices for Indeck Yerkes Energy Center?

Yes. InfraMap has NYISO day-ahead and real-time prices at 1 price node linked to Indeck Yerkes Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • NYISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page