Natural gasOperatingMISO

ExxonMobil Beaumont Refinery

Natural gas power plant in Jefferson County, Texas. 677.8 MW of nameplate capacity across 10 generators, operated by ExxonMobil Oil Corp.

Also known as ExxonMobil Beaumont Refinery Power Station · EIA plant 50625

Analyst: free account, 1 question a day.

HEB00048Chickadee G-3SabineExxonMobil Beaumont Refinery10 km
Open in the map
6 plants within 22 km, from EIA coordinates.

Key facts

Capacity
677.8 MWNameplate
Generators
10 operatingEIA-860M, August 2026
Operating since
January 1966First generator online
Operator
ExxonMobil Oil CorpEIA operator ID 6090
Grid
MISOBalancing authority MISO
Price nodes
1 MISO nodeResource nodes with prices
Location
Jefferson County, TX30.0636, −94.0753
EIA plant ID
50625EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power ExxonMobil Beaumont Refinery produces

Free · EIA-923

Net generation, 2025

4.42 TWh

4,416,676 MWh, final

Capacity factor, 2025

74.4%

2024: 73.3%

January to July 2026

2.05 TWh

Provisional. 6 of 7 months reported

Range, 2015 to 2025

4.0–4.5

TWh a year. Low 2020, high 2022

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20001,508,370Not reported12 of 12
20011,584,731Not reported12 of 12
20021,923,210Not reported12 of 12
2003782,302Not reported5 of 12
20041,183,922Not reported12 of 12
20052,588,291Not reported12 of 12
20064,039,672Not reported12 of 12
20072,814,742Not reported12 of 12
2008242,232Not reported1 of 12
20093,186,901Not reported12 of 12
20103,376,943Not reported12 of 12
20114,077,13068.7%12 of 12
20124,337,59172.9%12 of 12
20134,660,18778.5%12 of 12
20143,943,77766.4%12 of 12
20154,073,05368.6%12 of 12
20164,037,19867.8%12 of 12
20174,336,69873.0%12 of 12
20184,210,85070.9%12 of 12
20194,091,15568.9%12 of 12
20203,972,26466.7%12 of 12
20214,143,47269.8%12 of 12
20224,464,46275.2%12 of 12
20234,253,881Not reported12 of 12
20244,365,76473.3%12 of 12
20254,416,67674.4%12 of 12
2026 (provisional, partial year)2,049,98169.6%6 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2025

2.40M

US short tons. 2024: 2.37M

SO₂, 2025

10

US short tons

NOx, 2025

184

US short tons

CO₂ per MWh, calculated

0.54 t

About 1,086 lb per MWh

3 of 3 EPA units reported CO₂ in 2025 (61STK1, 61STK2, 61STK3), matched to EIA plant 50625 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
ETGOther Gases7.5January 1978
TG22Natural Gas Steam Turbine27.2February 1978
TG23Natural Gas Steam Turbine40.5June 1993
TG24Natural Gas Fired Combustion Turbine38.6June 1993
TG32Natural Gas Steam Turbine25.0January 1970
TG33Natural Gas Steam Turbine20.0January 1966
TG34Natural Gas Steam Turbine30.0January 1967
TG41Natural Gas Fired Combustion Turbine163.0June 2005
TG42Natural Gas Fired Combustion Turbine163.0April 2005
TG43Natural Gas Fired Combustion Turbine163.0December 2004

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists ExxonMobil Oil Corp as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query ExxonMobil Beaumont Refinery and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near ExxonMobil Beaumont Refinery

More plants operated by ExxonMobil Oil Corp

Questions about ExxonMobil Beaumont Refinery

How much power does ExxonMobil Beaumont Refinery produce?

ExxonMobil Beaumont Refinery reported 4,416,676 MWh (4.42 TWh) of net generation in 2025, a 74.4% capacity factor on 677.8 MW of nameplate capacity. From January to July 2026 it reported 2.05 TWh, which is provisional.

Where is ExxonMobil Beaumont Refinery?

ExxonMobil Beaumont Refinery is in Jefferson County, Texas, at 30.0636, −94.0753. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates ExxonMobil Beaumont Refinery?

EIA-860M for August 2026 lists ExxonMobil Oil Corp as the operator (EIA operator ID 6090). The operator is not always the owner.

When did ExxonMobil Beaumont Refinery start operating?

Its first generator began operating in January 1966, according to EIA-860M.

Does InfraMap have power prices for ExxonMobil Beaumont Refinery?

Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to ExxonMobil Beaumont Refinery, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page