Sterling Power Plant

Natural gas power plant in Oneida County, New York. 65.3 MW of nameplate capacity across 3 generators, operated by Sterling Power Partners LP.

Also known as EIA plant 50744

Analyst: free account, 1 question a day.

Pivot Solar NY 4StockbridgeSterling5 km
Open in the map
6 plants within 8.7 km, from EIA coordinates.

Key facts

Capacity
65.3 MWNatural gas 64.2 · Oil 1.1
Generators
3 operatingEIA-860M, August 2026
Operating since
June 1991First generator online
Operator
Sterling Power Partners LPEIA operator ID 14182
Grid
NYISOBalancing authority NYIS
Price nodes
1 NYISO nodeResource nodes with prices
Location
Oneida County, NY43.0803, −75.6010
EIA plant ID
50744EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Sterling produces

Free · EIA-923

Net generation, 2025

22.7 GWh

22,658 MWh, final

Capacity factor, 2025

4.0%

2024: 0.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

2.1–25.2

GWh a year. Low 2023, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200050,541Not reported12 of 12
200160,528Not reported12 of 12
200263,765Not reported12 of 12
200317,890Not reported12 of 12
20045,926Not reported12 of 12
200552,417Not reported12 of 12
200612,221Not reported12 of 12
20076,832Not reported12 of 12
20083,360Not reported12 of 12
20098,467Not reported12 of 12
201012,0332.1%12 of 12
20114,4520.8%12 of 12
201237,8406.6%12 of 12
201326,929Not reported12 of 12
201422,4833.9%12 of 12
201521,6653.8%12 of 12
201611,6312.0%12 of 12
201712,3742.2%12 of 12
201825,2404.4%12 of 12
20197,4111.3%12 of 12
20204,1010.7%12 of 12
202115,1712.7%12 of 12
20223,7900.7%12 of 12
20232,1310.4%12 of 12
20243,7220.6%12 of 12
202522,6584.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · NYISO

Emissions

Free · EPA CAMPD

CO₂, 2025

11,304

US short tons. 2024: 1,903

SO₂, 2025

0

US short tons

NOx, 2025

16

US short tons

CO₂ per MWh, calculated

0.50 t

About 998 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (1), matched to EIA plant 50744 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Natural Gas Fired Combined Cycle47.7June 1991
GEN2Natural Gas Fired Combined Cycle16.5July 1991
GEN3Petroleum Liquids1.1June 1991

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Sterling Power Partners LP as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Sterling Power Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Sterling

Questions about Sterling

How much power does Sterling Power Plant produce?

Sterling Power Plant reported 22,658 MWh (22.7 GWh) of net generation in 2025, a 4.0% capacity factor on 65.3 MW of nameplate capacity.

Where is Sterling Power Plant?

Sterling Power Plant is in Oneida County, New York, at 43.0803, −75.6010. It is in the New York Independent System Operator balancing area (NYIS).

Who operates Sterling Power Plant?

EIA-860M for August 2026 lists Sterling Power Partners LP as the operator (EIA operator ID 14182). The operator is not always the owner.

When did Sterling Power Plant start operating?

Its first generator began operating in June 1991, according to EIA-860M.

Does InfraMap have power prices for Sterling Power Plant?

Yes. InfraMap has NYISO day-ahead and real-time prices at 1 price node linked to Sterling Power Plant, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • NYISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page