Natural gasOperatingPJM

Cumberland (NJ)

Natural gas power plant in Cumberland County, New Jersey. 231.2 MW of nameplate capacity across 2 generators, operated by Calpine New Jersey Generation LLC.

Also known as Cumberland Energy Center · EIA plant 5083

Analyst: free account, 1 question a day.

Vineland Mays Landing SolarClayvilleCornerstone Power Vineland I LLCSherman AvenueMaple SolarCumberland (NJ)5 km
Open in the map
6 plants within 13 km, from EIA coordinates.

Key facts

Capacity
231.2 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
May 1990First generator online
Operator
Calpine New Jersey Generation LLCEIA operator ID 56606
Grid
PJMBalancing authority PJM
Price nodes
2 PJM nodesResource nodes with prices
Location
Cumberland County, NJ39.3757, −74.9654
EIA plant ID
5083EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Cumberland (NJ) produces

Free · EIA-923

Net generation, 2025

119 GWh

119,393 MWh, final

Capacity factor, 2025

5.9%

2024: 2.9%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

59.9–198.5

GWh a year. Low 2024, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200042,143Not reported12 of 12
2001Not reportedNot reported0 of 12
200235,281Not reported12 of 12
200314,329Not reported10 of 12
200419,227Not reported12 of 12
200523,189Not reported12 of 12
200618,998Not reported12 of 12
200741,560Not reported12 of 12
200829,653Not reported12 of 12
200925,305Not reported12 of 12
201062,8353.1%12 of 12
201157,0202.8%12 of 12
201243,3142.1%12 of 12
201380,1204.0%12 of 12
201450,8476.1%5 of 12
2015106,1035.2%12 of 12
2016115,9645.7%12 of 12
2017174,7248.6%12 of 12
2018198,4829.8%12 of 12
201995,6954.7%12 of 12
202067,8133.3%12 of 12
202160,2533.0%12 of 12
202295,4444.7%12 of 12
202365,5983.2%12 of 12
202459,9062.9%12 of 12
2025119,3935.9%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

74,035

US short tons. 2024: 38,818

SO₂, 2025

0

US short tons

NOx, 2025

20

US short tons

CO₂ per MWh, calculated

0.62 t

About 1,240 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (4001, 5001), matched to EIA plant 5083 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CUMBNatural Gas Fired Combustion Turbine99.4May 1990
CUMB2Natural Gas Fired Combustion Turbine131.8June 2009

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Calpine New Jersey Generation LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Cumberland (NJ) and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Cumberland (NJ)

More plants operated by Calpine New Jersey Generation LLC

Questions about Cumberland (NJ)

How much power does Cumberland (NJ) produce?

Cumberland (NJ) reported 119,393 MWh (119 GWh) of net generation in 2025, a 5.9% capacity factor on 231.2 MW of nameplate capacity.

Where is Cumberland (NJ)?

Cumberland (NJ) is in Cumberland County, New Jersey, at 39.3757, −74.9654. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Cumberland (NJ)?

EIA-860M for August 2026 lists Calpine New Jersey Generation LLC as the operator (EIA operator ID 56606). The operator is not always the owner.

When did Cumberland (NJ) start operating?

Its first generator began operating in May 1990, according to EIA-860M.

Does InfraMap have power prices for Cumberland (NJ)?

Yes. InfraMap has PJM day-ahead and real-time prices at 2 price nodes linked to Cumberland (NJ), with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page