Landfill gasOperatingCAISO

Nove Power Plant

Landfill gas power plant in Contra Costa County, California. 3 MW of nameplate capacity across 3 generators, operated by Nove Investments I LLC.

Also known as EIA plant 50831

Analyst: free account, 1 question a day.

Marin Clean Energy Solar OneRichmond CogenCA Dept of Public Health at RichmondBio-RadPhillips 66 Rodeo RefineryP66 Rodeo SolarNove5 km
Open in the map
6 plants within 14 km, from EIA coordinates.

Key facts

Capacity
3 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
December 1985First generator online
Operator
Nove Investments I LLCEIA operator ID 13876
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Contra Costa County, CA37.9676, −122.3820
EIA plant ID
50831EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Nove produces

Free · EIA-923

Net generation, 2025

0 MWh

0 MWh, final

Capacity factor, 2025

0.0%

2024: 0.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.0–11.2

GWh a year. Low 2023, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200117,686Not reported12 of 12
200215,272Not reported12 of 12
200321,199Not reported12 of 12
20040Not reported12 of 12
2005Not reportedNot reported0 of 12
200616,454Not reported12 of 12
200715,291Not reported12 of 12
200817,454Not reported12 of 12
200913,563Not reported12 of 12
201013,06349.7%12 of 12
201111,39543.4%12 of 12
201211,65144.2%12 of 12
201314,99057.0%12 of 12
201413,74952.3%12 of 12
201511,18742.6%12 of 12
20164,76118.1%12 of 12
20171,2574.8%12 of 12
20186192.4%12 of 12
20191,1294.3%12 of 12
20201,3845.3%12 of 12
20211,7026.5%12 of 12
2022350.1%12 of 12
202300.0%12 of 12
202400.0%12 of 12
202500.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Landfill Gas1.0December 1985
GEN2Landfill Gas1.0May 1987
GEN3Landfill Gas1.0December 1985

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Nove Investments I LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Nove Power Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Nove

Questions about Nove

How much power does Nove Power Plant produce?

Nove Power Plant reported 0 MWh (0 MWh) of net generation in 2025.

Where is Nove Power Plant?

Nove Power Plant is in Contra Costa County, California, at 37.9676, −122.3820. It is in the California Independent System Operator balancing area (CISO).

Who operates Nove Power Plant?

EIA-860M for August 2026 lists Nove Investments I LLC as the operator (EIA operator ID 13876). The operator is not always the owner.

When did Nove Power Plant start operating?

Its first generator began operating in December 1985, according to EIA-860M.

Does InfraMap have power prices for Nove Power Plant?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Nove Power Plant, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page