CoalOperatingMISO

TES Filer City Station

Coal power plant in Manistee County, Michigan. 70 MW of nameplate capacity across 1 generator, operated by TES Filer City Station LP.

Also known as EIA plant 50835

Analyst: free account, 1 question a day.

C W TippyMichigan Power LPLudingtonHodenpylTES Filer City Station25 km
Open in the map
6 plants within 41 km, from EIA coordinates.

Key facts

Capacity
70 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
May 1990First generator online
Operator
TES Filer City Station LPEIA operator ID 18414
Grid
MISOBalancing authority MISO
Price nodes
1 MISO nodeResource nodes with prices
Location
Manistee County, MI44.2173, −86.2891
EIA plant ID
50835EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power TES Filer City Station produces

Free · EIA-923

Net generation, 2025

351 GWh

351,278 MWh, final

Capacity factor, 2025

57.3%

2024: 37.4%

January to July 2026

150 GWh

Provisional

Range, 2015 to 2025

230.2–510.4

GWh a year. Low 2024, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000492,153Not reported12 of 12
2001146,448Not reported5 of 12
2002268,902Not reported12 of 12
2003458,857Not reported12 of 12
200444,078Not reported1 of 12
2005448,582Not reported12 of 12
2006490,179Not reported12 of 12
2007484,115Not reported12 of 12
2008482,382Not reported12 of 12
2009501,694Not reported12 of 12
2010493,74380.5%12 of 12
2011454,69574.2%12 of 12
2012492,29480.1%12 of 12
2013454,36774.1%12 of 12
2014413,08880.9%10 of 12
2015505,01982.4%12 of 12
2016124,88081.7%3 of 12
2017168,21782.8%4 of 12
2018123,57681.7%3 of 12
2019452,98573.9%12 of 12
2020510,43083.0%12 of 12
2021488,83379.7%12 of 12
2022498,45781.3%12 of 12
2023317,74051.8%12 of 12
2024230,19937.4%12 of 12
2025351,27857.3%12 of 12
2026 (provisional, partial year)150,33142.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2025

Not reported

US short tons. 2024: Not reported

SO₂, 2025

135

US short tons

NOx, 2025

869

US short tons

0 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 50835 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Conventional Steam Coal70.0May 1990

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists TES Filer City Station LP as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query TES Filer City Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near TES Filer City Station

Questions about TES Filer City Station

How much power does TES Filer City Station produce?

TES Filer City Station reported 351,278 MWh (351 GWh) of net generation in 2025, a 57.3% capacity factor on 70 MW of nameplate capacity. From January to July 2026 it reported 150 GWh, which is provisional.

Where is TES Filer City Station?

TES Filer City Station is in Manistee County, Michigan, at 44.2173, −86.2891. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates TES Filer City Station?

EIA-860M for August 2026 lists TES Filer City Station LP as the operator (EIA operator ID 18414). The operator is not always the owner.

When did TES Filer City Station start operating?

Its first generator began operating in May 1990, according to EIA-860M.

Does InfraMap have power prices for TES Filer City Station?

Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to TES Filer City Station, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page