HydroOperatingIPCO

S E Hazelton A

Hydro power plant in Jerome County, Idaho. 8.7 MW of nameplate capacity across 3 generators, operated by North Side Energy Company.

Also known as Hazelton A Hydroelectric Facility · S.E. Hazelton A · SE Hazelton A · EIA plant 50896

Analyst: free account, 1 question a day.

Hazelton B HydroBypassMilner HydroWilson Lake Hydroelectric ProjectMilner Butte LFGEMilner Dam Wind Park LLCS E Hazelton A5 km
Open in the map
6 plants within 15 km, from EIA coordinates.

Key facts

Capacity
8.7 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
June 1990First generator online
Operator
North Side Energy CompanyEIA operator ID 60851
Grid
IPCOBalancing authority IPCO
Price nodes
None linkedNo verified ISO node
Location
Jerome County, ID42.5867, −114.0675
EIA plant ID
50896EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power S E Hazelton A produces

Free · EIA-923

Net generation, 2025

24.9 GWh

24,868 MWh, final

Capacity factor, 2025

32.6%

2024: 32.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

22.0–27.2

GWh a year. Low 2017, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200121,882Not reported12 of 12
200220,297Not reported12 of 12
200320,815Not reported12 of 12
2004Not reportedNot reported0 of 12
200519,839Not reported12 of 12
200621,839Not reported12 of 12
200724,007Not reported12 of 12
200822,840Not reported12 of 12
200922,787Not reported12 of 12
201024,11732.8%12 of 12
201123,84232.4%12 of 12
201224,71633.5%12 of 12
201323,00731.3%12 of 12
201426,68236.3%12 of 12
201524,15932.8%12 of 12
201622,65730.7%12 of 12
201721,98429.9%12 of 12
201823,97232.6%12 of 12
201923,07331.4%12 of 12
202027,19936.9%12 of 12
202124,90833.8%12 of 12
202222,12430.1%12 of 12
202322,961Not reported12 of 12
202424,73432.4%12 of 12
202524,86832.6%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Conventional Hydroelectric2.9June 1990
GEN2Conventional Hydroelectric2.9June 1990
GEN3Conventional Hydroelectric2.9June 1990

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists North Side Energy Company as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query S E Hazelton A and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near S E Hazelton A

More plants operated by North Side Energy Company

Questions about S E Hazelton A

How much power does S E Hazelton A produce?

S E Hazelton A reported 24,868 MWh (24.9 GWh) of net generation in 2025, a 32.6% capacity factor on 8.7 MW of nameplate capacity.

Where is S E Hazelton A?

S E Hazelton A is in Jerome County, Idaho, at 42.5867, −114.0675. It is in the Idaho Power Company balancing area (IPCO).

Who operates S E Hazelton A?

EIA-860M for August 2026 lists North Side Energy Company as the operator (EIA operator ID 60851). The operator is not always the owner.

When did S E Hazelton A start operating?

Its first generator began operating in June 1990, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page