Natural gasOperatingERCOT

Power Station 4

Natural gas power plant in Galveston County, Texas. 156.4 MW of nameplate capacity across 2 generators, operated by South Houston Green Power LLC.

Also known as EIA plant 52132

Analyst: free account, 1 question a day.

Air Products Texas CityHeightsGCWAPower Station 41 km
Open in the map
6 plants within 3.1 km, from EIA coordinates.

Key facts

Capacity
156.4 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
September 1986First generator online
Operator
South Houston Green Power LLCEIA operator ID 17566
Grid
ERCOTBalancing authority ERCO
Price nodes
None linkedNo verified ISO node
Location
Galveston County, TX29.3782, −94.9219
EIA plant ID
52132EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Power Station 4 produces

Free · EIA-923

Net generation, 2025

517 GWh

516,802 MWh, final

Capacity factor, 2025

30.9%

2024: 23.9%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

12.1–672.2

GWh a year. Low 2016, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200089,907Not reported12 of 12
20011,064,021Not reported12 of 12
20021,340,705Not reported12 of 12
20031,105,951Not reported11 of 12
2004755,461Not reported12 of 12
2005463,771Not reported12 of 12
2006502,553Not reported12 of 12
2007214,013Not reported12 of 12
2008319,803Not reported12 of 12
2009237,833Not reported12 of 12
2010934,77455.8%12 of 12
2011660,75139.5%12 of 12
2012512,80630.5%12 of 12
2013366,115Not reported12 of 12
2014205,83912.3%12 of 12
2015294,44717.6%12 of 12
201612,1180.7%12 of 12
2017251,08815.0%12 of 12
2018672,17440.2%12 of 12
2019626,71737.4%12 of 12
2020350,04720.9%12 of 12
2021298,47217.8%12 of 12
2022580,52534.7%12 of 12
2023629,07237.6%12 of 12
2024401,44023.9%12 of 12
2025516,80230.9%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Natural Gas Fired Combined Cycle78.2September 1986
GEN2Natural Gas Fired Combined Cycle78.2September 1986

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists South Houston Green Power LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Power Station 4 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Power Station 4

More plants operated by South Houston Green Power LLC

Questions about Power Station 4

How much power does Power Station 4 produce?

Power Station 4 reported 516,802 MWh (517 GWh) of net generation in 2025, a 30.9% capacity factor on 156.4 MW of nameplate capacity.

Where is Power Station 4?

Power Station 4 is in Galveston County, Texas, at 29.3782, −94.9220. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Power Station 4?

EIA-860M for August 2026 lists South Houston Green Power LLC as the operator (EIA operator ID 17566). The operator is not always the owner.

When did Power Station 4 start operating?

Its first generator began operating in September 1986, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page