Natural gasOperatingCAISO

CP Kelco San Diego Plant

Natural gas power plant in San Diego County, California. 19.2 MW of nameplate capacity across 2 generators, operated by CP Kelco US Inc..

Also known as EIA plant 52147

Analyst: free account, 1 question a day.

Naval Hospital Medical CenterSan Diego International Airport BESSParadise Energy StorageCP Kelco San Diego Plant2 km
Open in the map
6 plants within 8.8 km, from EIA coordinates.

Key facts

Capacity
19.2 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
October 1983First generator online
Operator
CP Kelco US Inc.EIA operator ID 3221
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
San Diego County, CA32.6947, −117.1436
EIA plant ID
52147EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power CP Kelco San Diego Plant produces

Free · EIA-923

Net generation, 2025

74.9 GWh

74,864 MWh, final

Capacity factor, 2025

29.3%

2024: 27.5%

January to July 2026

39.9 GWh

Provisional

Range, 2015 to 2025

70.6–110.5

GWh a year. Low 2024, high 2023

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001208,869Not reported12 of 12
2002204,916Not reported12 of 12
2003215,860Not reported12 of 12
2004201,211Not reported12 of 12
2005183,161Not reported12 of 12
2006145,130Not reported12 of 12
2007146,729Not reported12 of 12
2008105,591Not reported12 of 12
2009100,282Not reported12 of 12
201085,12054.0%12 of 12
201180,25132.7%12 of 12
201284,59034.4%12 of 12
201383,53834.1%12 of 12
201487,58235.7%12 of 12
2015105,47643.0%12 of 12
201688,98036.2%12 of 12
201782,02733.4%12 of 12
201881,59033.3%12 of 12
201990,100Not reported12 of 12
202090,82335.4%12 of 12
202178,20430.6%12 of 12
202290,38935.3%12 of 12
2023110,48643.2%12 of 12
202470,64127.5%12 of 12
202574,86429.3%12 of 12
2026 (provisional, partial year)39,85326.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Natural Gas Fired Combustion Turbine9.2October 1983
GEN2Natural Gas Fired Combustion Turbine10.0October 1983

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists CP Kelco US Inc. as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query CP Kelco San Diego Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near CP Kelco San Diego Plant

Questions about CP Kelco San Diego Plant

How much power does CP Kelco San Diego Plant produce?

CP Kelco San Diego Plant reported 74,864 MWh (74.9 GWh) of net generation in 2025, a 29.3% capacity factor on 19.2 MW of nameplate capacity. From January to July 2026 it reported 39.9 GWh, which is provisional.

Where is CP Kelco San Diego Plant?

CP Kelco San Diego Plant is in San Diego County, California, at 32.6947, −117.1436. It is in the California Independent System Operator balancing area (CISO).

Who operates CP Kelco San Diego Plant?

EIA-860M for August 2026 lists CP Kelco US Inc. as the operator (EIA operator ID 3221). The operator is not always the owner.

When did CP Kelco San Diego Plant start operating?

Its first generator began operating in October 1983, according to EIA-860M.

Does InfraMap have power prices for CP Kelco San Diego Plant?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to CP Kelco San Diego Plant, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page