Wood biomassOperatingSCEG

Sylvamo Corporation Eastover Facility

Wood biomass power plant in Richland County, South Carolina. 109.6 MW of nameplate capacity across 2 generators, operated by Sylvamo Corporation - Eastover.

Also known as Sylvamo Eastover Facility Cogeneration · EIA plant 52151

Analyst: free account, 1 question a day.

WatereeSt. Matthews SolarLone Star SolarRichland County LandfillColumbia Energy Center (SC)Sylvamo Corporation E…10 km
Open in the map
6 plants within 35 km, from EIA coordinates.

Key facts

Capacity
109.6 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
April 1984First generator online
Operator
Sylvamo Corporation - EastoverEIA operator ID 9424
Grid
SCEGBalancing authority SCEG
Price nodes
None linkedNo verified ISO node
Location
Richland County, SC33.8872, −80.6397
EIA plant ID
52151EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Sylvamo Corporation Eastover Facility produces

Free · EIA-923

Net generation, 2025

564 GWh

564,480 MWh, final

Capacity factor, 2025

58.8%

2024: 54.0%

January to July 2026

310 GWh

Provisional

Range, 2015 to 2025

520.3–591.1

GWh a year. Low 2024, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200022,705Not reported12 of 12
200147,690Not reported1 of 12
2002522,873Not reported12 of 12
200386,687Not reported2 of 12
2004818,036Not reported12 of 12
2005759,898Not reported12 of 12
2006770,222Not reported12 of 12
2007804,244Not reported12 of 12
2008659,987Not reported12 of 12
2009602,859Not reported12 of 12
2010599,57162.4%12 of 12
2011591,50761.6%12 of 12
2012576,62159.9%12 of 12
201345,70456.0%1 of 12
2014548,35457.1%12 of 12
2015577,98960.2%12 of 12
2016574,03659.6%12 of 12
2017586,07161.0%12 of 12
2018591,05561.6%12 of 12
2019580,39560.5%12 of 12
2020575,44259.8%12 of 12
2021537,48161.2%11 of 12
2022539,817Not reported12 of 12
2023527,694Not reported12 of 12
2024520,34154.0%12 of 12
2025564,48058.8%12 of 12
2026 (provisional, partial year)309,52655.5%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2020

Not reported

US short tons. 2019: Not reported

SO₂, 2020

Not reported

US short tons

NOx, 2020

34

US short tons

0 of 1 EPA units reported CO₂ in 2020 (1), matched to EIA plant 52151 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

1,253

million gallons

Consumption, 2024

203

million gallons

Source

Wateree River

Surface, Fresh. Mixed systems

Watershed stress

Very low/none · 0.139

USGS SUI, HUC12 Beech Creek-Wateree River

12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Wood/Wood Waste Biomass48.4April 1984
GEN2Wood/Wood Waste Biomass61.2June 1991

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Sylvamo Corporation - Eastover as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Sylvamo Corporation Eastover Facility and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Sylvamo Corporation Eastover Facility

Questions about Sylvamo Corporation Eastover Facility

How much power does Sylvamo Corporation Eastover Facility produce?

Sylvamo Corporation Eastover Facility reported 564,480 MWh (564 GWh) of net generation in 2025, a 58.8% capacity factor on 109.6 MW of nameplate capacity. From January to July 2026 it reported 310 GWh, which is provisional.

Where is Sylvamo Corporation Eastover Facility?

Sylvamo Corporation Eastover Facility is in Richland County, South Carolina, at 33.8872, −80.6397. It is in the Dominion Energy South Carolina balancing area (SCEG).

Who operates Sylvamo Corporation Eastover Facility?

EIA-860M for August 2026 lists Sylvamo Corporation - Eastover as the operator (EIA operator ID 9424). The operator is not always the owner.

When did Sylvamo Corporation Eastover Facility start operating?

Its first generator began operating in April 1984, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page