HydroOperatingISO-NE

Hydro Kennebec Project

Hydro power plant in Kennebec County, Maine. 15.4 MW of nameplate capacity across 2 generators, operated by Hydro Kennebec LLC.

Also known as EIA plant 54148

Analyst: free account, 1 question a day.

Lockwood Hydroelectric FacilityWinslow PV - BD Solar…Barefoot SolarMessalonskee 5Solar Mule, LLCCenergy - Waterville (CSG)Hydro Kennebec Project2 km
Open in the map
6 plants within 4.8 km, from EIA coordinates.

Key facts

Capacity
15.4 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
January 1989First generator online
Operator
Hydro Kennebec LLCEIA operator ID 56597
Grid
ISO-NEBalancing authority ISNE
Price nodes
1 ISONE nodeResource nodes with prices
Location
Kennebec County, ME44.5630, −69.6192
EIA plant ID
54148EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Hydro Kennebec Project produces

Free · EIA-923

Net generation, 2025

32.4 GWh

32,385 MWh, final

Capacity factor, 2025

24.0%

2024: 20.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

27.0–86.0

GWh a year. Low 2024, high 2019

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200168,065Not reported12 of 12
200269,515Not reported12 of 12
200379,793Not reported12 of 12
200486,968Not reported12 of 12
200594,921Not reported12 of 12
2006104,977Not reported12 of 12
200789,872Not reported12 of 12
2008109,046Not reported12 of 12
200986,059Not reported12 of 12
201050,33738.3%12 of 12
201181,517Not reported12 of 12
201287,32264.6%12 of 12
201389,91166.6%12 of 12
201489,43966.3%12 of 12
201540,68030.2%12 of 12
201661,11345.2%12 of 12
201772,64653.9%12 of 12
201883,04361.6%12 of 12
201986,01463.8%12 of 12
202064,24047.5%12 of 12
202132,54224.1%12 of 12
202246,82734.7%12 of 12
202369,60751.6%12 of 12
202427,04220.0%12 of 12
202532,38524.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ISONE

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Conventional Hydroelectric7.7January 1989
GEN2Conventional Hydroelectric7.7January 1989

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Hydro Kennebec LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Hydro Kennebec Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Hydro Kennebec Project

Questions about Hydro Kennebec Project

How much power does Hydro Kennebec Project produce?

Hydro Kennebec Project reported 32,385 MWh (32.4 GWh) of net generation in 2025, a 24.0% capacity factor on 15.4 MW of nameplate capacity.

Where is Hydro Kennebec Project?

Hydro Kennebec Project is in Kennebec County, Maine, at 44.5630, −69.6192. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Hydro Kennebec Project?

EIA-860M for August 2026 lists Hydro Kennebec LLC as the operator (EIA operator ID 56597). The operator is not always the owner.

When did Hydro Kennebec Project start operating?

Its first generator began operating in January 1989, according to EIA-860M.

Does InfraMap have power prices for Hydro Kennebec Project?

Yes. InfraMap has ISONE day-ahead and real-time prices at 1 price node linked to Hydro Kennebec Project, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page