Natural gasOperatingISO-NE

Pfizer Groton Plant

Natural gas power plant in New London County, Connecticut. 37.5 MW of nameplate capacity across 4 generators, operated by Pfizer Inc.

Also known as EIA plant 54236

Analyst: free account, 1 question a day.

Bridge Street 1 & 2Water Treatment 1 & 2Gary Court 1 & 2CMEEC - Polaris Park Solar HybridPfizer Groton Plant2 km
Open in the map
6 plants within 5.5 km, from EIA coordinates.

Key facts

Capacity
37.5 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
January 1952First generator online
Operator
Pfizer IncEIA operator ID 14928
Grid
ISO-NEBalancing authority ISNE
Price nodes
None linkedNo verified ISO node
Location
New London County, CT41.3315, −72.0786
EIA plant ID
54236EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Pfizer Groton Plant produces

Free · EIA-923

Net generation, 2025

75.0 GWh

75,037 MWh, final

Capacity factor, 2025

22.8%

2024: 23.6%

January to July 2026

49.9 GWh

Provisional

Range, 2017 to 2025

75.0–87.2

GWh a year. Low 2025, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200191,629Not reported12 of 12
2002101,842Not reported12 of 12
200394,199Not reported12 of 12
200490,212Not reported12 of 12
200576,479Not reported12 of 12
200664,767Not reported12 of 12
200762,457Not reported12 of 12
200841,188Not reported12 of 12
200970,418Not reported9 of 12
201081,43630.8%9 of 12
201181,67830.9%9 of 12
201269,75226.4%9 of 12
201384,80824.2%12 of 12
201475,82021.6%12 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
201787,19526.5%12 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
202086,97526.4%12 of 12
202175,93223.1%12 of 12
202275,19622.9%12 of 12
2023Not reportedNot reported0 of 12
202477,68523.6%12 of 12
202575,03722.8%12 of 12
2026 (provisional, partial year)49,86326.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GT-1Natural Gas Fired Combustion Turbine10.0September 2009
TG 3Natural Gas Steam Turbine10.0January 1952
TG 4Natural Gas Steam Turbine10.0January 1994
TG5Natural Gas Steam Turbine7.5August 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Pfizer Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Pfizer Groton Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Pfizer Groton Plant

Questions about Pfizer Groton Plant

How much power does Pfizer Groton Plant produce?

Pfizer Groton Plant reported 75,037 MWh (75.0 GWh) of net generation in 2025, a 22.8% capacity factor on 37.5 MW of nameplate capacity. From January to July 2026 it reported 49.9 GWh, which is provisional.

Where is Pfizer Groton Plant?

Pfizer Groton Plant is in New London County, Connecticut, at 41.3315, −72.0786. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Pfizer Groton Plant?

EIA-860M for August 2026 lists Pfizer Inc as the operator (EIA operator ID 14928). The operator is not always the owner.

When did Pfizer Groton Plant start operating?

Its first generator began operating in January 1952, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page