HydroOperatingMISO

Norway Point Hydropower Project

Hydro power plant in Alpena County, Michigan. 4 MW of nameplate capacity across 2 generators, operated by Eagle Creek Renewable Energy, LLC.

Also known as EIA plant 54340

Analyst: free account, 1 question a day.

Four Mile Hydropower ProjectNinth Street Hydropower ProjectNorway Point Hydropow…5 km
Open in the map
3 plants within 9.4 km, from EIA coordinates.

Key facts

Capacity
4 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
September 1990First generator online
Operator
Eagle Creek Renewable Energy, LLCEIA operator ID 57280
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Alpena County, MI45.1025, −83.5189
EIA plant ID
54340EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Norway Point Hydropower Project produces

Free · EIA-923

Net generation, 2025

13.0 GWh

13,049 MWh, final

Capacity factor, 2025

37.2%

2024: 43.5%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

13.0–20.3

GWh a year. Low 2022, high 2019

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200112,185Not reported12 of 12
200214,825Not reported12 of 12
200312,019Not reported12 of 12
200413,712Not reported12 of 12
200511,962Not reported12 of 12
200617,708Not reported12 of 12
200712,827Not reported12 of 12
200814,357Not reported12 of 12
200918,714Not reported12 of 12
201012,59335.9%12 of 12
201117,15649.0%12 of 12
201211,27132.1%12 of 12
201315,69644.8%12 of 12
201418,08251.6%12 of 12
201515,42244.0%12 of 12
201615,88245.2%12 of 12
201719,99157.1%12 of 12
201817,40649.7%12 of 12
201920,34158.1%12 of 12
202014,72541.9%12 of 12
202113,75939.3%12 of 12
202212,99537.1%12 of 12
202314,01440.0%12 of 12
202415,27043.5%12 of 12
202513,04937.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric2.8September 1990
2Conventional Hydroelectric1.2September 1990

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Eagle Creek Renewable Energy, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Norway Point Hydropower Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Norway Point Hydropower Project

More plants operated by Eagle Creek Renewable Energy, LLC

Questions about Norway Point Hydropower Project

How much power does Norway Point Hydropower Project produce?

Norway Point Hydropower Project reported 13,049 MWh (13.0 GWh) of net generation in 2025, a 37.2% capacity factor on 4 MW of nameplate capacity.

Where is Norway Point Hydropower Project?

Norway Point Hydropower Project is in Alpena County, Michigan, at 45.1025, −83.5189. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Norway Point Hydropower Project?

EIA-860M for August 2026 lists Eagle Creek Renewable Energy, LLC as the operator (EIA operator ID 57280). The operator is not always the owner.

When did Norway Point Hydropower Project start operating?

Its first generator began operating in September 1990, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page