Cadillac Renewable Energy
Wood biomass power plant in Wexford County, Michigan. 44 MW of nameplate capacity across 1 generator, operated by Cadillac Renewable Energy LLC.
Also known as EIA plant 54415
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 44 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- August 2020First generator online
- Operator
- Cadillac Renewable Energy LLCEIA operator ID 55600
- Grid
- MISOBalancing authority MISO
- Price nodes
- 2 MISO nodesResource nodes with prices
- Location
- Wexford County, MI44.2617, −85.4352
- EIA plant ID
- 54415EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Cadillac Renewable Energy produces
Free · EIA-923Net generation, 2025
169 GWh
169,454 MWh, final
Capacity factor, 2025
44.0%
2024: 35.1%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2015 to 2025
95.7–169.5
GWh a year. Low 2019, high 2025
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | 233,981 | Not reported | 12 of 12 |
| 2002 | 212,124 | Not reported | 12 of 12 |
| 2003 | 215,436 | Not reported | 12 of 12 |
| 2004 | 220,219 | Not reported | 12 of 12 |
| 2005 | 218,976 | Not reported | 12 of 12 |
| 2006 | 220,683 | Not reported | 12 of 12 |
| 2007 | 206,427 | Not reported | 12 of 12 |
| 2008 | 214,645 | Not reported | 12 of 12 |
| 2009 | 161,087 | Not reported | 12 of 12 |
| 2010 | 206,353 | 53.5% | 12 of 12 |
| 2011 | 188,101 | 48.8% | 12 of 12 |
| 2012 | 154,112 | 39.9% | 12 of 12 |
| 2013 | 162,643 | 42.2% | 12 of 12 |
| 2014 | 175,312 | 45.5% | 12 of 12 |
| 2015 | 129,380 | 33.6% | 12 of 12 |
| 2016 | 137,132 | 35.5% | 12 of 12 |
| 2017 | 141,423 | 36.7% | 12 of 12 |
| 2018 | 167,044 | 43.3% | 12 of 12 |
| 2019 | 95,712 | 24.8% | 12 of 12 |
| 2020 | 49,639 | Not reported | 8 of 12 |
| 2021 | 144,352 | 37.5% | 12 of 12 |
| 2022 | 138,451 | 35.9% | 12 of 12 |
| 2023 | 130,883 | 34.0% | 12 of 12 |
| 2024 | 135,689 | 35.1% | 12 of 12 |
| 2025 | 169,454 | 44.0% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · MISOEmissions
Free · EPA CAMPDCO₂, 2025
Not reported
US short tons. 2024: Not reported
SO₂, 2025
73
US short tons
NOx, 2025
229
US short tons
0 of 1 EPA units reported CO₂ in 2025 (EUBLR), matched to EIA plant 54415 through the EPA–EIA crosswalk.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| GEN2 | Wood/Wood Waste Biomass | 44.0 | August 2020 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Cadillac Renewable Energy LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Cadillac Renewable Energy and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Cadillac Renewable Energy
Questions about Cadillac Renewable Energy
How much power does Cadillac Renewable Energy produce?
Cadillac Renewable Energy reported 169,454 MWh (169 GWh) of net generation in 2025, a 44.0% capacity factor on 44 MW of nameplate capacity.
Where is Cadillac Renewable Energy?
Cadillac Renewable Energy is in Wexford County, Michigan, at 44.2617, −85.4352. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).
Who operates Cadillac Renewable Energy?
EIA-860M for August 2026 lists Cadillac Renewable Energy LLC as the operator (EIA operator ID 55600). The operator is not always the owner.
When did Cadillac Renewable Energy start operating?
Its first generator began operating in August 2020, according to EIA-860M.
Does InfraMap have power prices for Cadillac Renewable Energy?
Yes. InfraMap has MISO day-ahead and real-time prices at 2 price nodes linked to Cadillac Renewable Energy, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
- MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page