Wood biomassOperatingMISO

Cadillac Renewable Energy

Wood biomass power plant in Wexford County, Michigan. 44 MW of nameplate capacity across 1 generator, operated by Cadillac Renewable Energy LLC.

Also known as EIA plant 54415

Analyst: free account, 1 question a day.

Stoney Corners Wind FarmLake CityMorey RoadNational Energy of McBainCadillac Renewable En…10 km
Open in the map
5 plants within 18 km, from EIA coordinates.

Key facts

Capacity
44 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
August 2020First generator online
Operator
Cadillac Renewable Energy LLCEIA operator ID 55600
Grid
MISOBalancing authority MISO
Price nodes
2 MISO nodesResource nodes with prices
Location
Wexford County, MI44.2617, −85.4352
EIA plant ID
54415EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Cadillac Renewable Energy produces

Free · EIA-923

Net generation, 2025

169 GWh

169,454 MWh, final

Capacity factor, 2025

44.0%

2024: 35.1%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

95.7–169.5

GWh a year. Low 2019, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001233,981Not reported12 of 12
2002212,124Not reported12 of 12
2003215,436Not reported12 of 12
2004220,219Not reported12 of 12
2005218,976Not reported12 of 12
2006220,683Not reported12 of 12
2007206,427Not reported12 of 12
2008214,645Not reported12 of 12
2009161,087Not reported12 of 12
2010206,35353.5%12 of 12
2011188,10148.8%12 of 12
2012154,11239.9%12 of 12
2013162,64342.2%12 of 12
2014175,31245.5%12 of 12
2015129,38033.6%12 of 12
2016137,13235.5%12 of 12
2017141,42336.7%12 of 12
2018167,04443.3%12 of 12
201995,71224.8%12 of 12
202049,639Not reported8 of 12
2021144,35237.5%12 of 12
2022138,45135.9%12 of 12
2023130,88334.0%12 of 12
2024135,68935.1%12 of 12
2025169,45444.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2025

Not reported

US short tons. 2024: Not reported

SO₂, 2025

73

US short tons

NOx, 2025

229

US short tons

0 of 1 EPA units reported CO₂ in 2025 (EUBLR), matched to EIA plant 54415 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN2Wood/Wood Waste Biomass44.0August 2020

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Cadillac Renewable Energy LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Cadillac Renewable Energy and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Cadillac Renewable Energy

Questions about Cadillac Renewable Energy

How much power does Cadillac Renewable Energy produce?

Cadillac Renewable Energy reported 169,454 MWh (169 GWh) of net generation in 2025, a 44.0% capacity factor on 44 MW of nameplate capacity.

Where is Cadillac Renewable Energy?

Cadillac Renewable Energy is in Wexford County, Michigan, at 44.2617, −85.4352. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Cadillac Renewable Energy?

EIA-860M for August 2026 lists Cadillac Renewable Energy LLC as the operator (EIA operator ID 55600). The operator is not always the owner.

When did Cadillac Renewable Energy start operating?

Its first generator began operating in August 2020, according to EIA-860M.

Does InfraMap have power prices for Cadillac Renewable Energy?

Yes. InfraMap has MISO day-ahead and real-time prices at 2 price nodes linked to Cadillac Renewable Energy, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page