Natural gasOperatingPJM

Thornridge High School

Natural gas power plant in Cook County, Illinois. 1 MW of nameplate capacity across 2 generators, operated by Thorton Township School Dist.

Also known as EIA plant 55005

Analyst: free account, 1 question a day.

CID Gas RecoveryExelon Solar ChicagoCalumet Energy Team LLCNorth Cottage Grove S…East ChicagoWhiting RefineryThornridge High School5 km
Open in the map
6 plants within 11 km, from EIA coordinates.

Key facts

Capacity
1 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
March 1996First generator online
Operator
Thorton Township School DistEIA operator ID 18850
Grid
PJMBalancing authority PJM
Price nodes
None linkedNo verified ISO node
Location
Cook County, IL41.6225, −87.5978
EIA plant ID
55005EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Thornridge High School produces

Free · EIA-923

Net generation, 2025

0 MWh

0 MWh, final

Capacity factor, 2025

0.0%

2024: 0.0%

January to July 2026

0 MWh

Provisional

Range, 2015 to 2025

0.0–79.0

MWh a year. Low 2018, high 2015

Annual net generation, MWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
20012,000Not reported12 of 12
20022,056Not reported12 of 12
20032,055Not reported12 of 12
20041,437Not reported12 of 12
20051,426Not reported12 of 12
20061,281Not reported12 of 12
2007953Not reported12 of 12
2008733Not reported12 of 12
2009523Not reported12 of 12
20104975.7%12 of 12
20114655.3%12 of 12
20128319.5%12 of 12
20135236.0%12 of 12
20141181.3%12 of 12
2015790.9%12 of 12
201610.0%12 of 12
201700.0%11 of 12
201800.0%12 of 12
201900.0%12 of 12
202000.0%12 of 12
202100.0%12 of 12
202200.0%12 of 12
202300.0%12 of 12
202400.0%12 of 12
202500.0%12 of 12
2026 (provisional, partial year)00.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Internal Combustion Engine0.5March 1996
2Natural Gas Internal Combustion Engine0.5March 1996

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Thorton Township School Dist as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Thornridge High School and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Thornridge High School

Questions about Thornridge High School

How much power does Thornridge High School produce?

Thornridge High School reported 0 MWh (0 MWh) of net generation in 2025. From January to July 2026 it reported 0 MWh, which is provisional.

Where is Thornridge High School?

Thornridge High School is in Cook County, Illinois, at 41.6225, −87.5978. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Thornridge High School?

EIA-860M for August 2026 lists Thorton Township School Dist as the operator (EIA operator ID 18850). The operator is not always the owner.

When did Thornridge High School start operating?

Its first generator began operating in March 1996, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page