Natural gasOperatingERCOT

Sweeny Cogen Facility

Natural gas power plant in Brazoria County, Texas. 572 MW of nameplate capacity across 4 generators, operated by Sweeny Cogeneration LLC.

Also known as Sweeny Cogeneration · EIA plant 55015

Analyst: free account, 1 question a day.

SweenySecond Division SolarBrazoria County Solar…Prospect StorageSweeny Cogen Facility5 km
Open in the map
6 plants within 12 km, from EIA coordinates.

Key facts

Capacity
572 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
August 1997First generator online
Operator
Sweeny Cogeneration LLCEIA operator ID 22214
Grid
ERCOTBalancing authority ERCO
Price nodes
4 ERCOT nodesResource nodes with prices
Location
Brazoria County, TX29.0728, −95.7450
EIA plant ID
55015EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Sweeny Cogen Facility produces

Free · EIA-923

Net generation, 2025

3.30 TWh

3,304,763 MWh, final

Capacity factor, 2025

66.0%

2024: 58.6%

January to July 2026

1.50 TWh

Provisional

Range, 2015 to 2025

2.3–3.3

TWh a year. Low 2023, high 2025

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20002,693,846Not reported12 of 12
20013,608,708Not reported12 of 12
20023,233,272Not reported12 of 12
20032,656,690Not reported10 of 12
20043,287,195Not reported12 of 12
20053,412,650Not reported12 of 12
20063,333,407Not reported12 of 12
20073,267,994Not reported12 of 12
20083,120,160Not reported12 of 12
20093,227,053Not reported12 of 12
20102,980,48759.5%12 of 12
20113,221,18864.3%12 of 12
20123,233,30264.4%12 of 12
20132,864,44557.2%12 of 12
20142,968,74159.2%12 of 12
20152,833,49056.5%12 of 12
20163,043,54660.6%12 of 12
20172,694,50553.8%12 of 12
20182,838,64456.7%12 of 12
20192,761,24055.1%12 of 12
20203,135,50562.4%12 of 12
20213,300,10365.9%12 of 12
20222,919,48258.3%12 of 12
20232,310,33846.1%12 of 12
20242,946,44158.6%12 of 12
20253,304,76366.0%12 of 12
2026 (provisional, partial year)1,502,49751.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

CO₂, 2025

3.01M

US short tons. 2024: 2.89M

SO₂, 2025

14

US short tons

NOx, 2025

503

US short tons

CO₂ per MWh, calculated

0.91 t

About 1,825 lb per MWh

4 of 4 EPA units reported CO₂ in 2025 (1, 2, 3, 4), matched to EIA plant 55015 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Natural Gas Fired Combustion Turbine143.0August 1997
GEN2Natural Gas Fired Combustion Turbine143.0September 1997
GEN3Natural Gas Fired Combustion Turbine143.0October 1997
GEN4Natural Gas Fired Combustion Turbine143.0December 2000

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Sweeny Cogeneration LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Sweeny Cogen Facility and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Sweeny Cogen Facility

Questions about Sweeny Cogen Facility

How much power does Sweeny Cogen Facility produce?

Sweeny Cogen Facility reported 3,304,763 MWh (3.30 TWh) of net generation in 2025, a 66.0% capacity factor on 572 MW of nameplate capacity. From January to July 2026 it reported 1.50 TWh, which is provisional.

Where is Sweeny Cogen Facility?

Sweeny Cogen Facility is in Brazoria County, Texas, at 29.0728, −95.7450. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Sweeny Cogen Facility?

EIA-860M for August 2026 lists Sweeny Cogeneration LLC as the operator (EIA operator ID 22214). The operator is not always the owner.

When did Sweeny Cogen Facility start operating?

Its first generator began operating in August 1997, according to EIA-860M.

Does InfraMap have power prices for Sweeny Cogen Facility?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 4 price nodes linked to Sweeny Cogen Facility, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page