Second Division Solar
Solar power plant in Brazoria County, Texas. 100 MW of nameplate capacity across 1 generator, operated by Lightsource Renewable Energy Asset Management, LLC.
Also known as EIA plant 65981
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 100 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- November 2024First generator online
- Operator
- Lightsource Renewable Energy Asset Management, LLCEIA operator ID 62842
- Grid
- ERCOTBalancing authority ERCO
- Price nodes
- 1 ERCOT nodeResource nodes with prices
- Location
- Brazoria County, TX29.1705, −95.7416
- EIA plant ID
- 65981EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Second Division Solar produces
Free · EIA-923Net generation, 2025
191 GWh
190,835 MWh, final
Capacity factor, 2025
21.8%
2024: Not reported
January to July 2026
109 GWh
Provisional
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | Not reported | Not reported | 0 of 12 |
| 2022 | Not reported | Not reported | 0 of 12 |
| 2023 | Not reported | Not reported | 0 of 12 |
| 2024 | 14,030 | Not reported | 2 of 12 |
| 2025 | 190,835 | 21.8% | 12 of 12 |
| 2026 (provisional, partial year) | 109,020 | 21.4% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · ERCOTEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| TXSD1 | Solar Photovoltaic | 100.0 | November 2024 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Lightsource Renewable Energy Asset Management, LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Second Division Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Second Division Solar
More plants operated by Lightsource Renewable Energy Asset Management, LLC
Questions about Second Division Solar
How much power does Second Division Solar produce?
Second Division Solar reported 190,835 MWh (191 GWh) of net generation in 2025, a 21.8% capacity factor on 100 MW of nameplate capacity. From January to July 2026 it reported 109 GWh, which is provisional.
Where is Second Division Solar?
Second Division Solar is in Brazoria County, Texas, at 29.1705, −95.7416. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).
Who operates Second Division Solar?
EIA-860M for August 2026 lists Lightsource Renewable Energy Asset Management, LLC as the operator (EIA operator ID 62842). The operator is not always the owner.
When did Second Division Solar start operating?
Its first generator began operating in November 2024, according to EIA-860M.
Does InfraMap have power prices for Second Division Solar?
Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Second Division Solar, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page