Natural gasOperatingISO-NE

Bridgeport Energy Project

Natural gas power plant in Fairfield County, Connecticut. 520 MW of nameplate capacity across 3 generators, operated by Bridgeport Energy LLC.

Also known as EIA plant 55042

Analyst: free account, 1 question a day.

UB Fuel CellWheelabrator BridgeportUI RCP Bridgeport SeasideBridgeport Energy Project1 km
Open in the map
5 plants within 2.4 km, from EIA coordinates.

Key facts

Capacity
520 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
June 1998First generator online
Operator
Bridgeport Energy LLCEIA operator ID 2232
Grid
ISO-NEBalancing authority ISNE
Price nodes
1 ISONE nodeResource nodes with prices
Location
Fairfield County, CT41.1692, −73.1844
EIA plant ID
55042EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Bridgeport Energy Project produces

Free · EIA-923

Net generation, 2025

2.40 TWh

2,397,502 MWh, final

Capacity factor, 2025

52.6%

2024: 58.0%

January to July 2026

1.71 TWh

Provisional

Range, 2016 to 2025

1.9–3.7

TWh a year. Low 2020, high 2018

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20001,608,364Not reported12 of 12
20012,297,521Not reported12 of 12
20023,335,252Not reported12 of 12
20032,155,870Not reported12 of 12
20043,180,200Not reported12 of 12
20052,700,010Not reported12 of 12
20062,393,165Not reported12 of 12
20072,550,227Not reported12 of 12
20081,949,339Not reported12 of 12
20092,619,225Not reported12 of 12
20103,294,27672.3%12 of 12
20112,861,18062.8%12 of 12
20122,913,27463.8%12 of 12
20133,017,481Not reported12 of 12
20142,544,680Not reported12 of 12
20152,792,632Not reported11 of 12
20163,672,18680.4%12 of 12
20172,374,48752.1%12 of 12
20183,675,28680.7%12 of 12
20192,462,93454.1%12 of 12
20201,923,24042.1%12 of 12
20212,294,863Not reported12 of 12
20222,576,24256.6%12 of 12
20232,571,93956.5%12 of 12
20242,649,66158.0%12 of 12
20252,397,50252.6%12 of 12
2026 (provisional, partial year)1,713,62764.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ISONE

Emissions

Free · EPA CAMPD

CO₂, 2025

998,747

US short tons. 2024: 1.13M

SO₂, 2025

5

US short tons

NOx, 2025

163

US short tons

CO₂ per MWh, calculated

0.42 t

About 833 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (BE1, BE2), matched to EIA plant 55042 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

48,036

million gallons

Consumption, 2024

Not reported

million gallons

Source

Pequonnock River

Surface, Brackish. Once-through

Watershed stress

Very low/none · 0.162

USGS SUI, HUC12 Rooster River-Frontal Long Island Sound

12 of 12 cooling months report withdrawal. Saline, brackish or ocean intake; not tested. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Natural Gas Fired Combined Cycle170.0June 1998
GEN2Natural Gas Fired Combined Cycle170.0June 1998
GEN3Natural Gas Fired Combined Cycle180.0May 1999

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Bridgeport Energy LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Bridgeport Energy Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Bridgeport Energy Project

Questions about Bridgeport Energy Project

How much power does Bridgeport Energy Project produce?

Bridgeport Energy Project reported 2,397,502 MWh (2.40 TWh) of net generation in 2025, a 52.6% capacity factor on 520 MW of nameplate capacity. From January to July 2026 it reported 1.71 TWh, which is provisional.

Where is Bridgeport Energy Project?

Bridgeport Energy Project is in Fairfield County, Connecticut, at 41.1692, −73.1844. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Bridgeport Energy Project?

EIA-860M for August 2026 lists Bridgeport Energy LLC as the operator (EIA operator ID 2232). The operator is not always the owner.

When did Bridgeport Energy Project start operating?

Its first generator began operating in June 1998, according to EIA-860M.

Does InfraMap have power prices for Bridgeport Energy Project?

Yes. InfraMap has ISONE day-ahead and real-time prices at 1 price node linked to Bridgeport Energy Project, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page