Natural gasOperatingISO-NE

Fairfield University CHP Plant

Natural gas power plant in Fairfield County, Connecticut. 4.5 MW of nameplate capacity across 1 generator, operated by Fairfield University.

Also known as EIA plant 56928

Analyst: free account, 1 question a day.

Bridgeport Fuel Cell, LLCUI RCP Bridgeport Sea…Fairfield University…2 km
Open in the map
6 plants within 6.2 km, from EIA coordinates.

Key facts

Capacity
4.5 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
October 2007First generator online
Operator
Fairfield UniversityEIA operator ID 56143
Grid
ISO-NEBalancing authority ISNE
Price nodes
None linkedNo verified ISO node
Location
Fairfield County, CT41.1589, −73.2572
EIA plant ID
56928EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Fairfield University CHP Plant produces

Free · EIA-923

Net generation, 2025

23.3 GWh

23,338 MWh, final

Capacity factor, 2025

59.2%

2024: 66.1%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

17.8–26.1

GWh a year. Low 2017, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
200825,554Not reported12 of 12
200924,500Not reported12 of 12
201022,05055.9%12 of 12
201124,04761.0%12 of 12
201225,19563.7%12 of 12
201329,15474.0%12 of 12
201423,95060.8%12 of 12
201524,76762.8%12 of 12
201624,44961.9%12 of 12
201717,77645.1%12 of 12
201824,30361.7%12 of 12
201923,43559.4%12 of 12
202024,14361.1%12 of 12
202122,14756.2%12 of 12
202224,36161.8%12 of 12
202325,32464.2%12 of 12
202426,10966.1%12 of 12
202523,33859.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CHP1Natural Gas Fired Combustion Turbine4.5October 2007

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Fairfield University as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Fairfield University CHP Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Fairfield University CHP Plant

Questions about Fairfield University CHP Plant

How much power does Fairfield University CHP Plant produce?

Fairfield University CHP Plant reported 23,338 MWh (23.3 GWh) of net generation in 2025, a 59.2% capacity factor on 4.5 MW of nameplate capacity.

Where is Fairfield University CHP Plant?

Fairfield University CHP Plant is in Fairfield County, Connecticut, at 41.1589, −73.2572. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Fairfield University CHP Plant?

EIA-860M for August 2026 lists Fairfield University as the operator (EIA operator ID 56143). The operator is not always the owner.

When did Fairfield University CHP Plant start operating?

Its first generator began operating in October 2007, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page