Natural gasOperatingERCOT

Jameson Gas Processing Plant

Natural gas power plant in Coke County, Texas. 1.8 MW of nameplate capacity across 4 generators, operated by WTG Jameson, L.P..

Also known as EIA plant 55052

Analyst: free account, 1 question a day.

Goat Wind LPBluebell Solar IIBluebell SolarMaryneal WindpowerSweetwater Wind 5Aviator WindJameson Gas Processing Plant10 km
Open in the map
6 plants within 29 km, from EIA coordinates.

Key facts

Capacity
1.8 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
January 1981First generator online
Operator
WTG Jameson, L.P.EIA operator ID 50114
Grid
ERCOTBalancing authority ERCO
Price nodes
None linkedNo verified ISO node
Location
Coke County, TX32.0500, −100.6917
EIA plant ID
55052EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Jameson Gas Processing Plant produces

Free · EIA-923

Net generation, 2025

Not reported

Not reported MWh, final. 0 of 12 months reported

Capacity factor, 2025

Not reported

2024: Not reported

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2023

10.5–15.4

GWh a year. Low 2016, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200110,400Not reported12 of 12
200210,800Not reported12 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
200510,107Not reported12 of 12
200610,057Not reported12 of 12
200710,671Not reported12 of 12
200810,843Not reported12 of 12
200910,921Not reported12 of 12
201010,478108.7%12 of 12
201110,901113.1%12 of 12
201210,935113.2%12 of 12
201310,865112.8%12 of 12
201410,950Not reported12 of 12
201510,69993.9%12 of 12
201610,53492.2%12 of 12
201713,029Not reported12 of 12
201814,74993.5%12 of 12
201915,24496.7%12 of 12
202015,40597.4%12 of 12
202115,37497.5%12 of 12
202214,61592.7%12 of 12
202312,85081.5%12 of 12
2024Not reportedNot reported0 of 12
2025Not reportedNot reported0 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
620Natural Gas Internal Combustion Engine0.4January 1981
621Natural Gas Internal Combustion Engine0.4January 1981
622Natural Gas Internal Combustion Engine0.5January 1986
GN410Natural Gas Internal Combustion Engine0.5June 2017

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists WTG Jameson, L.P. as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Jameson Gas Processing Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Jameson Gas Processing Plant

Questions about Jameson Gas Processing Plant

Where is Jameson Gas Processing Plant?

Jameson Gas Processing Plant is in Coke County, Texas, at 32.0500, −100.6917. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Jameson Gas Processing Plant?

EIA-860M for August 2026 lists WTG Jameson, L.P. as the operator (EIA operator ID 50114). The operator is not always the owner.

When did Jameson Gas Processing Plant start operating?

Its first generator began operating in January 1981, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page