Natural gasOperatingERCOT

Lamar Power Project

Natural gas power plant in Lamar County, Texas. 1,112.6 MW of nameplate capacity across 6 generators, operated by LaFrontera Holdings LLC.

Also known as EIA plant 55097

Analyst: free account, 1 question a day.

Tyson NickEiffel Solar ProjectParis Energy CenterChisumEstonian Solar Project, LLC10 km
Open in the map
6 plants within 27 km, from EIA coordinates.

Key facts

Capacity
1,112.6 MWNameplate
Generators
6 operatingEIA-860M, August 2026
Operating since
May 2000First generator online
Operator
LaFrontera Holdings LLCEIA operator ID 60477
Grid
ERCOTBalancing authority ERCO
Price nodes
None linkedNo verified ISO node
Location
Lamar County, TX33.6308, −95.5900
EIA plant ID
55097EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Lamar Power Project produces

Free · EIA-923

Net generation, 2025

6.86 TWh

6,862,791 MWh, final

Capacity factor, 2025

70.4%

2024: 60.8%

January to July 2026

4.10 TWh

Provisional

Range, 2015 to 2025

5.5–7.3

TWh a year. Low 2022, high 2018

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20001,690,040Not reported12 of 12
20014,992,017Not reported12 of 12
20025,685,767Not reported12 of 12
20033,435,841Not reported12 of 12
20043,632,823Not reported12 of 12
20053,789,328Not reported12 of 12
20064,508,439Not reported12 of 12
20074,373,178Not reported12 of 12
20083,665,598Not reported12 of 12
20095,188,091Not reported12 of 12
20103,331,72234.9%12 of 12
20114,295,48045.0%12 of 12
20124,913,163Not reported12 of 12
20135,193,942Not reported12 of 12
20145,333,83354.9%12 of 12
20155,999,12161.8%12 of 12
20166,053,883Not reported12 of 12
20176,150,338Not reported12 of 12
20187,285,07574.7%12 of 12
20197,004,28771.9%12 of 12
20207,022,06371.9%12 of 12
20216,130,57162.9%12 of 12
20225,477,66756.2%12 of 12
20235,659,32258.1%12 of 12
20245,938,34860.8%12 of 12
20256,862,79170.4%12 of 12
2026 (provisional, partial year)4,099,22672.4%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

2.87M

US short tons. 2024: 2.49M

SO₂, 2025

14

US short tons

NOx, 2025

701

US short tons

CO₂ per MWh, calculated

0.42 t

About 835 lb per MWh

4 of 4 EPA units reported CO₂ in 2025 (1, 2, 3, 4), matched to EIA plant 55097 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

1,349

million gallons

Consumption, 2024

1,138

million gallons

Source

Lake Pat Mayse

Surface, Fresh. Induced-draft tower

Watershed stress

Moderate · 0.555

USGS SUI, HUC12 Auds Creek

12 of 24 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CTG1Natural Gas Fired Combined Cycle176.0May 2000
CTG2Natural Gas Fired Combined Cycle176.0May 2000
CTG3Natural Gas Fired Combined Cycle176.0December 2000
CTG4Natural Gas Fired Combined Cycle176.0December 2000
STG1Natural Gas Fired Combined Cycle204.3May 2000
STG2Natural Gas Fired Combined Cycle204.3May 2000

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists LaFrontera Holdings LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Lamar Power Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Lamar Power Project

More plants operated by LaFrontera Holdings LLC

Questions about Lamar Power Project

How much power does Lamar Power Project produce?

Lamar Power Project reported 6,862,791 MWh (6.86 TWh) of net generation in 2025, a 70.4% capacity factor on 1,112.6 MW of nameplate capacity. From January to July 2026 it reported 4.10 TWh, which is provisional.

Where is Lamar Power Project?

Lamar Power Project is in Lamar County, Texas, at 33.6308, −95.5900. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Lamar Power Project?

EIA-860M for August 2026 lists LaFrontera Holdings LLC as the operator (EIA operator ID 60477). The operator is not always the owner.

When did Lamar Power Project start operating?

Its first generator began operating in May 2000, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page