Estonian Solar Project, LLC

Solar and battery storage project in Delta County, Texas. 304.5 MW of nameplate capacity across 2 generators, operated by Enel Green Power Estonian Solar Project, LLC.

Also known as EIA plant 66872

This project groups Estonian Solar Project, LLC (EIA 66872). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Eiffel Solar ProjectLamar Power ProjectTyson NickMockingbird Solar CenterBright Arrow Solar, LLCImpact Solar 1Estonian Solar Project10 km
Open in the map
6 plants within 28 km, from EIA coordinates.

Key facts

Capacity
304.5 MWSolar 204.5 · Battery storage 100.0
Generators
2 operatingEIA-860M, August 2026
Operating since
January 2025First generator online
Operator
Enel Green Power Estonian Solar Project, LLCEIA operator ID 65799
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Delta County, TX33.4571, −95.6679
EIA plant ID
66872EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Estonian Solar Project produces

Free · EIA-923

Net generation, 2025

430 GWh

429,562 MWh, final. 11 of 12 months reported

Capacity factor, 2025

Not reported

2024: Not reported

January to July 2026

276 GWh

Provisional

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023Not reportedNot reported0 of 12
2024Not reportedNot reported0 of 12
2025429,562Not reported11 of 12
2026 (provisional, partial year)276,31927.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BESSBatteries100.0January 2025
SOLARSolar Photovoltaic204.5June 2025

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Enel Green Power Estonian Solar Project, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Estonian Solar Project, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Estonian Solar Project

Questions about Estonian Solar Project

How much power does Estonian Solar Project, LLC produce?

Estonian Solar Project, LLC reported 429,562 MWh (430 GWh) of net generation in 2025. From January to July 2026 it reported 276 GWh, which is provisional. 11 of 12 months were reported for 2025.

Where is Estonian Solar Project, LLC?

Estonian Solar Project, LLC is in Delta County, Texas, at 33.4571, −95.6679. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Estonian Solar Project, LLC?

EIA-860M for August 2026 lists Enel Green Power Estonian Solar Project, LLC as the operator (EIA operator ID 65799). The operator is not always the owner.

Is Estonian Solar Project, LLC a solar or a battery storage plant?

Both. Solar capacity totals 204.5 MW and battery storage capacity totals 100 MW.

When did Estonian Solar Project, LLC start operating?

Its first generator began operating in January 2025, according to EIA-860M.

Does InfraMap have power prices for Estonian Solar Project, LLC?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Estonian Solar Project, LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page