Channelview Cogeneration Plant

Natural gas power plant in Harris County, Texas. 918.3 MW of nameplate capacity across 5 generators, operated by EIF Channelview Cogeneration LLC.

Also known as EIA plant 55187

Analyst: free account, 1 question a day.

Odyssey Energy Altura Cogen, LLCSJRR (LIG)ChamonWAL3500WAL522Greens BayouChannelview Cogenerat…5 km
Open in the map
6 plants within 9.6 km, from EIA coordinates.

Key facts

Capacity
918.3 MWNameplate
Generators
5 operatingEIA-860M, August 2026
Operating since
August 2001First generator online
Operator
EIF Channelview Cogeneration LLCEIA operator ID 56380
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Harris County, TX29.8370, −95.1217
EIA plant ID
55187EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Channelview Cogeneration Plant produces

Free · EIA-923

Net generation, 2025

5.50 TWh

5,495,755 MWh, final

Capacity factor, 2025

68.3%

2024: 71.9%

January to July 2026

2.91 TWh

Provisional

Range, 2016 to 2025

5.0–5.8

TWh a year. Low 2023, high 2016

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001515,557Not reported6 of 12
20024,108,051Not reported12 of 12
20035,648,871Not reported12 of 12
20045,280,905Not reported12 of 12
20055,127,298Not reported12 of 12
20065,229,167Not reported12 of 12
20075,212,797Not reported12 of 12
20085,172,610Not reported12 of 12
20095,235,225Not reported12 of 12
20105,565,39769.2%12 of 12
20115,590,26769.5%12 of 12
20125,358,93266.4%12 of 12
20136,280,848Not reported12 of 12
20146,008,305Not reported12 of 12
20154,534,20867.2%10 of 12
20165,823,02872.2%12 of 12
20175,104,66263.5%12 of 12
20185,347,39266.5%12 of 12
20195,536,98368.8%12 of 12
20205,126,49463.6%12 of 12
20215,376,97866.8%12 of 12
20225,584,15669.4%12 of 12
20234,962,49461.7%12 of 12
20245,799,98371.9%12 of 12
20255,495,75568.3%12 of 12
2026 (provisional, partial year)2,906,79262.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

CO₂, 2025

3.41M

US short tons. 2024: 3.62M

SO₂, 2025

17

US short tons

NOx, 2025

303

US short tons

CO₂ per MWh, calculated

0.62 t

About 1,241 lb per MWh

4 of 4 EPA units reported CO₂ in 2025 (CHV1, CHV2, CHV3, CHV4), matched to EIA plant 55187 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

635

million gallons

Consumption, 2024

635

million gallons

Source

Multiple

Other, Other. Induced-draft tower

Watershed stress

Low · 0.205

USGS SUI, HUC12 Jackson Bayou-San Jacinto River

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GT1Natural Gas Fired Combined Cycle192.1June 2002
GT2Natural Gas Fired Combined Cycle192.1June 2002
GT3Natural Gas Fired Combined Cycle192.1June 2002
GT4Natural Gas Fired Combined Cycle192.1August 2001
ST1Natural Gas Fired Combined Cycle149.9June 2002

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists EIF Channelview Cogeneration LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Channelview Cogeneration Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Channelview Cogeneration Plant

Questions about Channelview Cogeneration Plant

How much power does Channelview Cogeneration Plant produce?

Channelview Cogeneration Plant reported 5,495,755 MWh (5.50 TWh) of net generation in 2025, a 68.3% capacity factor on 918.3 MW of nameplate capacity. From January to July 2026 it reported 2.91 TWh, which is provisional.

Where is Channelview Cogeneration Plant?

Channelview Cogeneration Plant is in Harris County, Texas, at 29.8370, −95.1217. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Channelview Cogeneration Plant?

EIA-860M for August 2026 lists EIF Channelview Cogeneration LLC as the operator (EIA operator ID 56380). The operator is not always the owner.

When did Channelview Cogeneration Plant start operating?

Its first generator began operating in August 2001, according to EIA-860M.

Does InfraMap have power prices for Channelview Cogeneration Plant?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Channelview Cogeneration Plant, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page