Natural gasOperatingERCOT

Chamon

Natural gas power plant in Harris County, Texas. 121 MW of nameplate capacity across 2 generators, operated by Peaker Power, LLC.

Also known as Chamon Power LLC · EIA plant 60460

Analyst: free account, 1 question a day.

WAL522Channelview Cogeneration PlantOdyssey Energy Altura Cogen, LLCCitadel Battery Stora…Chamon5 km
Open in the map
6 plants within 9.0 km, from EIA coordinates.

Key facts

Capacity
121 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
October 2017First generator online
Operator
Peaker Power, LLCEIA operator ID 61199
Grid
ERCOTBalancing authority ERCO
Price nodes
2 ERCOT nodesResource nodes with prices
Location
Harris County, TX29.8832, −95.1114
EIA plant ID
60460EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Chamon produces

Free · EIA-923

Net generation, 2025

51.3 GWh

51,297 MWh, final

Capacity factor, 2025

4.8%

2024: 10.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2018 to 2025

36.7–138.9

GWh a year. Low 2020, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
20175,640Not reported3 of 12
201845,857Not reported12 of 12
201961,6045.8%12 of 12
202036,6763.5%12 of 12
202165,6666.2%12 of 12
2022138,92313.1%12 of 12
2023116,31611.0%12 of 12
2024114,91210.8%12 of 12
202551,2974.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

CO₂, 2025

33,190

US short tons. 2024: 77,905

SO₂, 2025

0

US short tons

NOx, 2025

5

US short tons

CO₂ per MWh, calculated

0.65 t

About 1,294 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (CT1, CT2), matched to EIA plant 60460 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CH1Natural Gas Fired Combustion Turbine60.5October 2017
CH2Natural Gas Fired Combustion Turbine60.5October 2017

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Peaker Power, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Chamon and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Chamon

More plants operated by Peaker Power, LLC

Questions about Chamon

How much power does Chamon produce?

Chamon reported 51,297 MWh (51.3 GWh) of net generation in 2025, a 4.8% capacity factor on 121 MW of nameplate capacity.

Where is Chamon?

Chamon is in Harris County, Texas, at 29.8832, −95.1114. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Chamon?

EIA-860M for August 2026 lists Peaker Power, LLC as the operator (EIA operator ID 61199). The operator is not always the owner.

When did Chamon start operating?

Its first generator began operating in October 2017, according to EIA-860M.

Does InfraMap have power prices for Chamon?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 2 price nodes linked to Chamon, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page