Key facts

Capacity
678.3 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
August 2001First generator online
Operator
Los Medanos Energy Center LLCEIA operator ID 2843
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Contra Costa County, CA38.0301, −121.8730
EIA plant ID
55217EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Los Medanos produces

Free · EIA-923

Net generation, 2025

2.49 TWh

2,485,539 MWh, final

Capacity factor, 2025

41.8%

2024: 54.4%

January to July 2026

1.17 TWh

Provisional

Range, 2015 to 2025

2.5–3.6

TWh a year. Low 2025, high 2022

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
20023,611,388Not reported12 of 12
20033,255,848Not reported12 of 12
20043,690,627Not reported12 of 12
20053,594,588Not reported12 of 12
20062,935,701Not reported12 of 12
20073,476,895Not reported12 of 12
20083,064,966Not reported12 of 12
20093,358,185Not reported12 of 12
20103,290,90555.4%12 of 12
20112,677,75945.1%12 of 12
20123,594,41660.3%12 of 12
20133,524,876Not reported12 of 12
20143,540,55259.6%12 of 12
20152,603,56743.8%12 of 12
20162,852,47147.9%12 of 12
20173,205,56253.9%12 of 12
20183,274,74055.1%12 of 12
20192,707,14945.6%12 of 12
20202,976,02449.9%12 of 12
20213,329,13056.0%12 of 12
20223,557,55959.9%12 of 12
20233,062,09651.5%12 of 12
20243,241,42254.4%12 of 12
20252,485,53941.8%12 of 12
2026 (provisional, partial year)1,169,21133.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

1.13M

US short tons. 2024: 1.49M

SO₂, 2025

6

US short tons

NOx, 2025

123

US short tons

CO₂ per MWh, calculated

0.46 t

About 910 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (X724, X725), matched to EIA plant 55217 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

808

million gallons

Consumption, 2024

493

million gallons

Source

Delta Diablo Sanitation Dist

Discharge, Reclaimed. Induced-draft tower

Watershed stress

High · 0.605

USGS SUI, HUC12 Kirker Creek-Frontal Suisun Bay Estuaries

12 of 12 cooling months report withdrawal. Reclaimed water or plant effluent; not tested. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CTG1Natural Gas Fired Combined Cycle198.9August 2001
CTG2Natural Gas Fired Combined Cycle198.9August 2001
STG3Natural Gas Fired Combined Cycle280.5August 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Los Medanos Energy Center LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Los Medanos Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Los Medanos

Questions about Los Medanos

How much power does Los Medanos Energy Center produce?

Los Medanos Energy Center reported 2,485,539 MWh (2.49 TWh) of net generation in 2025, a 41.8% capacity factor on 678.3 MW of nameplate capacity. From January to July 2026 it reported 1.17 TWh, which is provisional.

Where is Los Medanos Energy Center?

Los Medanos Energy Center is in Contra Costa County, California, at 38.0301, −121.8730. It is in the California Independent System Operator balancing area (CISO).

Who operates Los Medanos Energy Center?

EIA-860M for August 2026 lists Los Medanos Energy Center LLC as the operator (EIA operator ID 2843). The operator is not always the owner.

When did Los Medanos Energy Center start operating?

Its first generator began operating in August 2001, according to EIA-860M.

Does InfraMap have power prices for Los Medanos Energy Center?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Los Medanos Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page