Natural gasOperatingPJM

Red Oak Power LLC

Natural gas power plant in Middlesex County, New Jersey. 821.1 MW of nameplate capacity across 4 generators, operated by Red Oak Operating Services LLC.

Also known as Red Oak Power · EIA plant 55239

Analyst: free account, 1 question a day.

Sayreville Cogeneration FacilitySayreville Solar ProjectParlin Solar LLCSouth River 2SayrevilleRed Oak Power1 km
Open in the map
6 plants within 3.1 km, from EIA coordinates.

Key facts

Capacity
821.1 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
March 2002First generator online
Operator
Red Oak Operating Services LLCEIA operator ID 22131
Grid
PJMBalancing authority PJM
Price nodes
4 PJM nodesResource nodes with prices
Location
Middlesex County, NJ40.4487, −74.3489
EIA plant ID
55239EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Red Oak Power produces

Free · EIA-923

Net generation, 2025

3.45 TWh

3,448,628 MWh, final

Capacity factor, 2025

47.9%

2024: 45.1%

January to July 2026

1.29 TWh

Provisional

Range, 2015 to 2025

2.4–6.0

TWh a year. Low 2021, high 2016

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002458,334Not reported11 of 12
2003522,868Not reported11 of 12
20041,662,979Not reported12 of 12
20051,471,723Not reported12 of 12
20061,585,477Not reported12 of 12
20072,521,581Not reported12 of 12
20082,296,757Not reported12 of 12
20093,731,232Not reported12 of 12
20104,401,71452.0%12 of 12
20114,992,725Not reported12 of 12
20125,083,335Not reported12 of 12
20133,831,843Not reported12 of 12
20145,428,446Not reported12 of 12
20155,810,09580.8%12 of 12
20165,955,25882.6%12 of 12
20175,293,60473.6%12 of 12
20184,268,42059.3%12 of 12
20195,092,12870.8%12 of 12
20202,779,50238.5%12 of 12
20212,417,92033.6%12 of 12
20223,137,65143.6%12 of 12
20233,149,69043.8%12 of 12
20243,249,38545.1%12 of 12
20253,448,62847.9%12 of 12
2026 (provisional, partial year)1,286,36130.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

1.46M

US short tons. 2024: 1.38M

SO₂, 2025

8

US short tons

NOx, 2025

132

US short tons

CO₂ per MWh, calculated

0.42 t

About 844 lb per MWh

3 of 3 EPA units reported CO₂ in 2025 (1, 2, 3), matched to EIA plant 55239 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

756

million gallons

Consumption, 2024

756

million gallons

Source

Sayreville-Duhernal

Surface, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.132

USGS SUI, HUC12 Tennent Brook-South River

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
0001Natural Gas Fired Combined Cycle180.2March 2002
0002Natural Gas Fired Combined Cycle180.2March 2002
0003Natural Gas Fired Combined Cycle180.2March 2002
0004Natural Gas Fired Combined Cycle280.5April 2002

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Red Oak Operating Services LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Red Oak Power LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Red Oak Power

Questions about Red Oak Power

How much power does Red Oak Power LLC produce?

Red Oak Power LLC reported 3,448,628 MWh (3.45 TWh) of net generation in 2025, a 47.9% capacity factor on 821.1 MW of nameplate capacity. From January to July 2026 it reported 1.29 TWh, which is provisional.

Where is Red Oak Power LLC?

Red Oak Power LLC is in Middlesex County, New Jersey, at 40.4487, −74.3489. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Red Oak Power LLC?

EIA-860M for August 2026 lists Red Oak Operating Services LLC as the operator (EIA operator ID 22131). The operator is not always the owner.

When did Red Oak Power LLC start operating?

Its first generator began operating in March 2002, according to EIA-860M.

Does InfraMap have power prices for Red Oak Power LLC?

Yes. InfraMap has PJM day-ahead and real-time prices at 4 price nodes linked to Red Oak Power LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page