Natural gasOperatingTVA

Calvert City

Natural gas power plant in Marshall County, Kentucky. 26.7 MW of nameplate capacity across 1 generator, operated by DTE Calvert City LLC.

Also known as Calvert City Power Plant · EIA plant 55308

Analyst: free account, 1 question a day.

BarkleySmithland Hydroelectric PlantCalvert City10 km
Open in the map
6 plants within 24 km, from EIA coordinates.

Key facts

Capacity
26.7 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
April 2000First generator online
Operator
DTE Calvert City LLCEIA operator ID 57295
Grid
TVABalancing authority TVA
Price nodes
None linkedNo verified ISO node
Location
Marshall County, KY37.0483, −88.3539
EIA plant ID
55308EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Calvert City produces

Free · EIA-923

Net generation, 2025

216 GWh

215,821 MWh, final

Capacity factor, 2025

92.3%

2024: 91.3%

January to July 2026

129 GWh

Provisional

Range, 2015 to 2025

185.3–222.6

GWh a year. Low 2018, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001184,143Not reported12 of 12
2002198,309Not reported12 of 12
2003149,312Not reported12 of 12
2004146,607Not reported12 of 12
2005150,428Not reported12 of 12
2006145,575Not reported12 of 12
2007190,917Not reported12 of 12
2008169,599Not reported12 of 12
2009200,140Not reported12 of 12
2010204,42887.4%12 of 12
2011212,66290.9%12 of 12
2012208,12888.7%12 of 12
2013189,45281.0%12 of 12
2014219,30193.8%12 of 12
2015212,10890.7%12 of 12
2016222,64094.9%12 of 12
2017220,20194.1%12 of 12
2018185,29179.2%12 of 12
2019212,52390.9%12 of 12
2020187,44987.3%11 of 12
2021210,47490.0%12 of 12
2022219,80294.0%12 of 12
2023206,02588.1%12 of 12
2024214,20891.3%12 of 12
2025215,82192.3%12 of 12
2026 (provisional, partial year)128,89094.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

Not reported

US short tons. 2024: Not reported

SO₂, 2025

Not reported

US short tons

NOx, 2025

52

US short tons

0 of 1 EPA units reported CO₂ in 2025 (C), matched to EIA plant 55308 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Natural Gas Fired Combustion Turbine26.7April 2000

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists DTE Calvert City LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Calvert City and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Calvert City

Questions about Calvert City

How much power does Calvert City produce?

Calvert City reported 215,821 MWh (216 GWh) of net generation in 2025, a 92.3% capacity factor on 26.7 MW of nameplate capacity. From January to July 2026 it reported 129 GWh, which is provisional.

Where is Calvert City?

Calvert City is in Marshall County, Kentucky, at 37.0483, −88.3539. It is in the Tennessee Valley Authority balancing area (TVA).

Who operates Calvert City?

EIA-860M for August 2026 lists DTE Calvert City LLC as the operator (EIA operator ID 57295). The operator is not always the owner.

When did Calvert City start operating?

Its first generator began operating in April 2000, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page