Natural gasOperatingCAISO

Metcalf Energy Center

Natural gas power plant in Santa Clara County, California. 635 MW of nameplate capacity across 3 generators, operated by Calpine Corp - Metcalf Energy Center.

Also known as EIA plant 55393

Analyst: free account, 1 question a day.

Malech Solar FarmHummingbird Energy Storage LLCMetcalf2 km
Open in the map
6 plants within 4.1 km, from EIA coordinates.

Key facts

Capacity
635 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
June 2005First generator online
Operator
Calpine Corp - Metcalf Energy CenterEIA operator ID 2799
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Santa Clara County, CA37.2207, −121.7457
EIA plant ID
55393EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Metcalf produces

Free · EIA-923

Net generation, 2025

2.33 TWh

2,334,357 MWh, final

Capacity factor, 2025

42.0%

2024: 49.7%

January to July 2026

655 GWh

Provisional

Range, 2015 to 2025

2.1–3.2

TWh a year. Low 2018, high 2015

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
20052,020,895Not reported12 of 12
20062,370,154Not reported12 of 12
20072,935,887Not reported12 of 12
20083,152,211Not reported12 of 12
20092,778,697Not reported12 of 12
20102,612,89647.0%12 of 12
20111,598,37828.7%12 of 12
20122,801,45750.2%12 of 12
20133,131,656Not reported12 of 12
20142,461,41344.2%12 of 12
20153,171,06857.0%12 of 12
20162,686,60248.2%12 of 12
20172,081,82237.4%12 of 12
20182,079,83237.4%12 of 12
20192,566,08146.1%12 of 12
20202,384,44242.7%12 of 12
20212,335,49842.0%12 of 12
20222,315,29841.6%12 of 12
20232,338,61842.0%12 of 12
20242,770,70949.7%12 of 12
20252,334,35742.0%12 of 12
2026 (provisional, partial year)654,93920.3%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

1.02M

US short tons. 2024: 1.21M

SO₂, 2025

5

US short tons

NOx, 2025

63

US short tons

CO₂ per MWh, calculated

0.43 t

About 870 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 55393 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

556

million gallons

Consumption, 2024

481

million gallons

Source

San Jose Municipal

Discharge, Reclaimed. Induced-draft tower

Watershed stress

Moderate · 0.444

USGS SUI, HUC12 Metcalfe Canyon-Coyote Creek

12 of 12 cooling months report withdrawal. Reclaimed water or plant effluent; not tested. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CTG1Natural Gas Fired Combined Cycle200.0June 2005
CTG2Natural Gas Fired Combined Cycle200.0June 2005
STG1Natural Gas Fired Combined Cycle235.0June 2005

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Calpine Corp - Metcalf Energy Center as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Metcalf Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Metcalf

Questions about Metcalf

How much power does Metcalf Energy Center produce?

Metcalf Energy Center reported 2,334,357 MWh (2.33 TWh) of net generation in 2025, a 42.0% capacity factor on 635 MW of nameplate capacity. From January to July 2026 it reported 655 GWh, which is provisional.

Where is Metcalf Energy Center?

Metcalf Energy Center is in Santa Clara County, California, at 37.2207, −121.7457. It is in the California Independent System Operator balancing area (CISO).

Who operates Metcalf Energy Center?

EIA-860M for August 2026 lists Calpine Corp - Metcalf Energy Center as the operator (EIA operator ID 2799). The operator is not always the owner.

When did Metcalf Energy Center start operating?

Its first generator began operating in June 2005, according to EIA-860M.

Does InfraMap have power prices for Metcalf Energy Center?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Metcalf Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page