Natural gasOperatingMISO

Columbia Energy Center

Natural gas power plant in Boone County, Missouri. 162.8 MW of nameplate capacity across 4 generators, operated by City of Columbia - (MO).

Also known as EIA plant 55447

Analyst: free account, 1 question a day.

Truman SolarMBS Textbook ExchangeAltona Solar, LLCFulton (MO)Columbia20 km
Open in the map
6 plants within 32 km, from EIA coordinates.

Key facts

Capacity
162.8 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
June 2001First generator online
Operator
City of Columbia - (MO)EIA operator ID 4045
Grid
MISOBalancing authority MISO
Price nodes
4 MISO nodesResource nodes with prices
Location
Boone County, MO39.0192, −92.2629
EIA plant ID
55447EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Columbia produces

Free · EIA-923

Net generation, 2025

51.0 GWh

50,997 MWh, final

Capacity factor, 2025

3.6%

2024: 0.9%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

2.7–51.0

GWh a year. Low 2016, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200113,869Not reported8 of 12
20027,786Not reported12 of 12
20037,089Not reported12 of 12
20042,879Not reported12 of 12
20057,404Not reported12 of 12
200624,566Not reported12 of 12
200712,789Not reported12 of 12
20082,120Not reported12 of 12
20091,444Not reported12 of 12
20103,6730.3%12 of 12
20113,9170.3%12 of 12
201212,0920.8%12 of 12
201329,0172.0%12 of 12
20146,4870.5%12 of 12
201511,0050.8%12 of 12
20162,7290.2%12 of 12
20178,1080.6%12 of 12
20187,8170.5%12 of 12
20196,8560.5%12 of 12
202015,1561.1%12 of 12
202123,4921.6%12 of 12
202246,3413.2%12 of 12
202320,0641.4%12 of 12
202413,2590.9%12 of 12
202550,9973.6%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2025

37,441

US short tons. 2024: 9,691

SO₂, 2025

0

US short tons

NOx, 2025

16

US short tons

CO₂ per MWh, calculated

0.73 t

About 1,468 lb per MWh

4 of 4 EPA units reported CO₂ in 2025 (CT01, CT02, CT03, CT04), matched to EIA plant 55447 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CT01Natural Gas Fired Combustion Turbine40.7July 2001
CT02Natural Gas Fired Combustion Turbine40.7July 2001
CT03Natural Gas Fired Combustion Turbine40.7June 2001
CT04Natural Gas Fired Combustion Turbine40.7July 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists City of Columbia - (MO) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Columbia Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Columbia

More plants operated by City of Columbia - (MO)

Questions about Columbia

How much power does Columbia Energy Center produce?

Columbia Energy Center reported 50,997 MWh (51.0 GWh) of net generation in 2025, a 3.6% capacity factor on 162.8 MW of nameplate capacity.

Where is Columbia Energy Center?

Columbia Energy Center is in Boone County, Missouri, at 39.0192, −92.2629. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Columbia Energy Center?

EIA-860M for August 2026 lists City of Columbia - (MO) as the operator (EIA operator ID 4045). The operator is not always the owner.

When did Columbia Energy Center start operating?

Its first generator began operating in June 2001, according to EIA-860M.

Does InfraMap have power prices for Columbia Energy Center?

Yes. InfraMap has MISO day-ahead and real-time prices at 4 price nodes linked to Columbia Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page