Natural gasOperatingMISO

Combined Locks Energy Center

Natural gas power plant in Outagamie County, Wisconsin. 66.5 MW of nameplate capacity across 2 generators, operated by McKinley Paper.

Also known as EIA plant 55558

Analyst: free account, 1 question a day.

Kaukauna City HydroKimberly MillNew BadgerCombined Locks1 km
Open in the map
6 plants within 2.9 km, from EIA coordinates.

Key facts

Capacity
66.5 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
May 2002First generator online
Operator
McKinley PaperEIA operator ID 744
Grid
MISOBalancing authority MISO
Price nodes
1 MISO nodeResource nodes with prices
Location
Outagamie County, WI44.2717, −88.3011
EIA plant ID
55558EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Combined Locks produces

Free · EIA-923

Net generation, 2025

302 GWh

301,616 MWh, final

Capacity factor, 2025

51.8%

2024: 53.1%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.0–402.8

GWh a year. Low 2015, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
20010Not reported2 of 12
2002Not reportedNot reported0 of 12
2003175,998Not reported12 of 12
200497,532Not reported12 of 12
2005113,210Not reported12 of 12
200645,659Not reported12 of 12
200774,629Not reported12 of 12
200843,052Not reported12 of 12
200933,863Not reported12 of 12
201024,1365.2%12 of 12
201123,7065.1%12 of 12
20126,8351.5%12 of 12
20134Not reported12 of 12
201400.0%12 of 12
20150Not reported12 of 12
201600.0%12 of 12
2017132,21522.7%12 of 12
2018288,11849.5%12 of 12
2019362,48762.2%12 of 12
2020402,83069.0%12 of 12
2021393,17067.5%12 of 12
2022327,09856.2%12 of 12
2023376,30064.6%12 of 12
2024310,44253.1%12 of 12
2025301,61651.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2025

162,825

US short tons. 2024: 173,633

SO₂, 2025

1

US short tons

NOx, 2025

15

US short tons

CO₂ per MWh, calculated

0.54 t

About 1,080 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (B06), matched to EIA plant 55558 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Natural Gas Fired Combined Cycle60.5May 2002
GEN2Natural Gas Fired Combined Cycle6.0May 2002

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists McKinley Paper as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Combined Locks Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Combined Locks

Questions about Combined Locks

How much power does Combined Locks Energy Center produce?

Combined Locks Energy Center reported 301,616 MWh (302 GWh) of net generation in 2025, a 51.8% capacity factor on 66.5 MW of nameplate capacity.

Where is Combined Locks Energy Center?

Combined Locks Energy Center is in Outagamie County, Wisconsin, at 44.2717, −88.3011. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Combined Locks Energy Center?

EIA-860M for August 2026 lists McKinley Paper as the operator (EIA operator ID 744). The operator is not always the owner.

When did Combined Locks Energy Center start operating?

Its first generator began operating in May 2002, according to EIA-860M.

Does InfraMap have power prices for Combined Locks Energy Center?

Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Combined Locks Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page