Natural gasOperatingBPAT

Frederickson Power LP

Natural gas power plant in Pierce County, Washington. 318.3 MW of nameplate capacity across 2 generators, operated by Frederickson Power LP.

Also known as Frederickson 1 Generating Station · EIA plant 55818

Analyst: free account, 1 question a day.

LRI LFGTE FacilityElectronYelmLaGrandeAlderFrederickson Power LP10 km
Open in the map
6 plants within 32 km, from EIA coordinates.

Key facts

Capacity
318.3 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
August 2002First generator online
Operator
Frederickson Power LPEIA operator ID 56613
Grid
BPATBalancing authority BPAT
Price nodes
None linkedNo verified ISO node
Location
Pierce County, WA47.0861, −122.3657
EIA plant ID
55818EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Frederickson Power LP produces

Free · EIA-923

Net generation, 2025

1.58 TWh

1,583,717 MWh, final

Capacity factor, 2025

56.8%

2024: 61.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.7–1.8

TWh a year. Low 2018, high 2023

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002243,906Not reported5 of 12
2003767,205Not reported12 of 12
2004759,664Not reported12 of 12
2005677,639Not reported12 of 12
2006787,760Not reported12 of 12
2007899,228Not reported12 of 12
20081,094,880Not reported12 of 12
2009911,010Not reported12 of 12
2010836,96530.0%12 of 12
201119,0018.0%1 of 12
2012351,40812.6%12 of 12
2013835,491Not reported12 of 12
2014698,09325.0%12 of 12
20151,250,04044.8%12 of 12
2016837,56230.0%12 of 12
2017931,44633.4%12 of 12
2018709,56225.4%12 of 12
20191,343,53448.2%12 of 12
2020959,86434.3%12 of 12
20211,289,67646.3%12 of 12
20221,259,03945.2%12 of 12
20231,824,05365.4%12 of 12
20241,717,65161.4%12 of 12
20251,583,71756.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

687,000

US short tons. 2024: 737,346

SO₂, 2025

3

US short tons

NOx, 2025

62

US short tons

CO₂ per MWh, calculated

0.43 t

About 868 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (F1CT), matched to EIA plant 55818 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

367

million gallons

Consumption, 2024

315

million gallons

Source

Municipality

Other, Other. Induced-draft tower

Watershed stress

Very low/none · 0.103

USGS SUI, HUC12 Clover Creek

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
FICTNatural Gas Fired Combined Cycle192.0August 2002
FISTNatural Gas Fired Combined Cycle126.3August 2002

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Frederickson Power LP as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Frederickson Power LP and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Frederickson Power LP

Questions about Frederickson Power LP

How much power does Frederickson Power LP produce?

Frederickson Power LP reported 1,583,717 MWh (1.58 TWh) of net generation in 2025, a 56.8% capacity factor on 318.3 MW of nameplate capacity.

Where is Frederickson Power LP?

Frederickson Power LP is in Pierce County, Washington, at 47.0861, −122.3657. It is in the Bonneville Power Administration balancing area (BPAT).

Who operates Frederickson Power LP?

EIA-860M for August 2026 lists Frederickson Power LP as the operator (EIA operator ID 56613). The operator is not always the owner.

When did Frederickson Power LP start operating?

Its first generator began operating in August 2002, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page