Natural gasOperatingCAISO

Malburg

Natural gas power plant in Los Angeles County, California. 130 MW of nameplate capacity across 3 generators, operated by City of Vernon - (CA).

Also known as Malburg Generating Station · EIA plant 56041

Analyst: free account, 1 question a day.

Dedeaux2555 E Olympic BlBig BearUSPS PVCald BESSMalburg2 km
Open in the map
6 plants within 4.8 km, from EIA coordinates.

Key facts

Capacity
130 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
October 2005First generator online
Operator
City of Vernon - (CA)EIA operator ID 19798
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Los Angeles County, CA33.9986, −118.2219
EIA plant ID
56041EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Malburg produces

Free · EIA-923

Net generation, 2025

310 GWh

310,436 MWh, final

Capacity factor, 2025

27.3%

2024: 30.8%

January to July 2026

152 GWh

Provisional

Range, 2015 to 2025

310.4–729.1

GWh a year. Low 2025, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005171,660Not reported12 of 12
2006877,754Not reported12 of 12
2007712Not reported12 of 12
2008433,284Not reported12 of 12
2009576,509Not reported12 of 12
2010721,22251.8%12 of 12
2011643,85646.3%12 of 12
2012702,68850.4%12 of 12
2013791,831Not reported12 of 12
2014868,214Not reported12 of 12
2015713,205Not reported12 of 12
2016729,12063.9%12 of 12
2017694,03860.9%12 of 12
2018479,36342.1%12 of 12
2019608,96053.5%12 of 12
2020605,73253.0%12 of 12
2021593,91052.2%12 of 12
2022470,44441.3%12 of 12
2023315,79727.7%12 of 12
2024351,75730.8%12 of 12
2025310,43627.3%12 of 12
2026 (provisional, partial year)152,47223.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

163,741

US short tons. 2024: 182,979

SO₂, 2025

1

US short tons

NOx, 2025

11

US short tons

CO₂ per MWh, calculated

0.53 t

About 1,055 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (M1, M2), matched to EIA plant 56041 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
M1Natural Gas Fired Combined Cycle40.0October 2005
M2Natural Gas Fired Combined Cycle40.0October 2005
M3Natural Gas Fired Combined Cycle50.0October 2005

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists City of Vernon - (CA) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Malburg and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Malburg

More plants operated by City of Vernon - (CA)

Questions about Malburg

How much power does Malburg produce?

Malburg reported 310,436 MWh (310 GWh) of net generation in 2025, a 27.3% capacity factor on 130 MW of nameplate capacity. From January to July 2026 it reported 152 GWh, which is provisional.

Where is Malburg?

Malburg is in Los Angeles County, California, at 33.9986, −118.2219. It is in the California Independent System Operator balancing area (CISO).

Who operates Malburg?

EIA-860M for August 2026 lists City of Vernon - (CA) as the operator (EIA operator ID 19798). The operator is not always the owner.

When did Malburg start operating?

Its first generator began operating in October 2005, according to EIA-860M.

Does InfraMap have power prices for Malburg?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Malburg, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page